GITEX AI Türkiye 2027
About the event
International technology and investment event whose themes include data centres, cloud and AI infrastructure, suited to digital infrastructure investors and technology leaders.
Who it is for / why attend
For DC teams wanting to meet investors, government and tech leaders in Turkey. There is a dedicated Data Centers track and a co-located Data Centre Türkiye event; the rest of the programme is general tech.
Venue
Dates and details are compiled from official organiser sources. Check the official website for the programme, admission requirements and registration status before making plans.
Read before you go
Explore the libraryNVIDIA 2025
NVIDIA DGX SuperPOD: Next Generation Scalable Infrastructure for AI Leadership - Reference Architecture featuring NVIDIA DGX GB200
Define the cluster template with SU = 8 NVL72 racks at 1.2 MW IT; auto-place SUs in rows following the reference rack layout, allocating ~150 kW per compute rack plus network racks.
- Each SU (8 DGX GB200 NVL72 racks) requires 1.2 MW TDP.
TELKODER - Telekomünikasyon Operatörleri Derneği 2021
12. Ulaştırma ve Haberleşme Şûrası – Haberleşme Çalışma Grubu Sektör Öngörü Raporu: Veri Merkezleri (TELKODER Görüşleri)
In benchmarking views, use the quoted regional PUE (about 1.6) as a Turkish baseline.
- Average PUE is quoted as 1.59 worldwide and 1.62 in Turkey's region (DCD 2020).
Bryden Wood 2026
Densification and the geometry of change: designing data centres in an age of uncertainty
Warn when high-density liquid-cooled racks are placed on upper floors without a matching structural floor-load rating.
- Delivery takes three to five years, so a 30 kW/rack design may need to carry twice that at go-live.
SoSo CAD
From technical references to data centre design
Review rack layouts, power supplies and cooling zones in a shared SoSo CAD project model.
Request a demo