Technical guidePDF2025

Accelerating Speed to Power/Winning the Artificial Intelligence Race: Federal Action To Rapidly Expand Grid Capacity and Enable Electricity Demand Growth (Request for Information, September 18, 2025)

Original title DOE Request for Information: Accelerating Speed to Power / Winning the AI Race: Federal Action to Rapidly Expand Grid Capacity (90 FR, September 18, 2025)

U.S. Department of Energy / Federal Register · U.S. Department of Energy

A US Department of Energy Grid Deployment Office request for information seeking large generation and transmission projects that can serve data-centre, semiconductor and manufacturing load growth. It targets projects enabling at least 3 GW and up to 20 GW of incremental load.

U.S. public domain — U.S. Government work; free to reuse

On this page

Overview

Published in the Federal Register of 18 September 2025 (Vol. 90, No. 179), the RFI starts from the observation that electricity demand growth from data centres, semiconductor plants and other large users is outpacing existing grid capacity. It notes multi-gigawatt demand increases in several regions, location-specific loads on accelerated timelines, and gaps in limited transmission capacity, congestion, ageing infrastructure and interconnection delays for both load and generation. Responses were due by 21 November 2025, as PDFs of no more than 15 pages.

DOE cites four executive orders (14154, 14179, 14262 and 14302) and asks for projects that enable a minimum incremental load of 3 GW and support up to 20 GW. Examples are new inter-regional transmission of at least 1,000 MVA, reconductoring of existing lines of at least 500 MVA, returning retired thermal plants to service using existing interconnection capacity, and new generation portfolios. The funding tools named are the Transmission Facilitation Program (DOE as anchor customer through capacity contracts), GRIP, Loan Programs Office loans and guarantees, and National Laboratory technical assistance.

The questions fall under six headings: large-scale generation and transmission projects (with fourteen detail items, including project size, stage, cost and timeline, siting, permitting and interconnection status); high-priority geographic areas; use of DOE funding, financing and technical assistance; load growth trends; grid infrastructure constraints (siting and permitting, financing, construction timelines, supply chain, workforce, interconnection queues, regulatory uncertainty, technology integration, community acceptance); and additional comments.

The document is a request for information only. It is not a funding opportunity or grant programme, and no applications are accepted; DOE may or may not issue a notice of funding opportunity (NOFO) afterwards. Responses are non-binding, receive no individual reply, and no compendium will be published. Respondents are advised not to include business-sensitive information, and to mark it clearly if they do.

Key points

  1. Rationale: demand growth from data centres, semiconductor plants and manufacturing is outpacing existing grid capacity.
  2. Target projects enable a minimum of 3 GW incremental load and support up to 20 GW.
  3. Examples: new inter-regional transmission of at least 1,000 MVA, reconductoring of at least 500 MVA, restart of retired thermal plants, new generation portfolios.
  4. DOE tools: Transmission Facilitation Program, GRIP, Loan Programs Office loans and guarantees, National Laboratory technical assistance.
  5. The RFI cites Executive Orders 14154, 14179, 14262 and 14302.
  6. Responses were due 21 November 2025, 5:00 p.m. ET, as PDFs of up to 15 pages.
  7. Barrier topics: siting and permitting, financing, construction timelines, supply chain, workforce, interconnection queues, regulatory uncertainty, technology integration and community acceptance.
  8. It is not a funding opportunity; DOE may or may not issue a NOFO.

Using it in design

  • When planning a large load connection, query the interconnection queue, transmission congestion and reconductoring potential for the relevant grid region early.
  • Compare the load size with the RFI's 3 GW and 20 GW thresholds to pre-screen eligibility for federal support.
  • Keep alternatives that speed power, such as restarting retired thermal plants and using their existing interconnection, as a separate scenario in site selection.
  • Note financing instruments such as loan guarantees and capacity contracts as options in the project structure.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Data-centre developers seeking large load connections, grid operators and energy policy specialists.

Document contents

  1. I. Background
  2. Infrastructure Projects
  3. DOE Funding Programs and Authorities
  4. II. RFI Questions
  5. 1. Large-Scale Generation and Transmission Projects To Enable Load Growth
  6. 2. High-Priority Geographic Areas for Targeted DOE Investment
  7. 3. Use of DOE Funding, Financing, and Technical Assistance
  8. 4. Load Growth Trends
  9. 5. Grid Infrastructure Constraints
  10. 6. Additional Comments
  11. III. RFI Response Guidelines
  12. IV. Disclaimer
  13. V. Confidential Business Information

Related standards

  • DOE Transmission Facilitation Program

Read the document

doe-rfi-speed-to-power-2025.pdf

PDF · 0.2 MB · English

U.S. public domain — U.S. Government work; free to reuse

The document is provided unaltered because its licence permits redistribution.

Publication details

Authors
U.S. Department of Energy
Publisher
U.S. Department of Energy / Federal Register
Year
2025
Document number
FR Doc. 2025-18058
Document language
English
Source type
Government / public
Access
Open licence — downloadable
Licence
U.S. public domain — U.S. Government work; free to reuse
Licence evidence
www.copyright.gov
Original licence note

Official Federal Register document (Office of the Federal Register / GPO govinfo); U.S. government work not subject to copyright (17 U.S.C. 105).

Citation

U.S. Department of Energy (2025). DOE Request for Information: Accelerating Speed to Power / Winning the AI Race: Federal Action to Rapidly Expand Grid Capacity (90 FR, September 18, 2025). U.S. Department of Energy / Federal Register. FR Doc. 2025-18058. https://www.govinfo.gov/content/pkg/FR-2025-09-18/pdf/2025-18058.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.