Overview

This document is a technical brief, prepared jointly by Lawrence Berkeley National Laboratory and The Brattle Group, that updates the January 2025 edition. The authors are Natalie Mims Frick, Peter Cappers, Goksin Kavlak, Long Lam, Ryan Hledik, Jadon Grove and Sebastian Rotella. It surveys US large-load tariffs and electric service agreements for data centres and classifies design elements by prevalence and trend.

The elements examined include minimum demand thresholds, contract duration, minimum billing demand, collateral, exit fees and load ramp schedules. According to the findings, large-load tariff minimum demand thresholds range from 0.3 to 150 MW, with 75% between 5 and 100 MW. Standardized minimum contract terms range from 1 to 20 years; the median rose from 5 years before 2025 to 12 years since 2025.

Minimum billing demand is typically a share of contract demand, with a median of 80%. This means the user pays for a large part of the contract power even if it does not actually draw it. The introduction cites an LBNL estimate that US data center demand grew 2.3 times from 2018 to 2024 and could grow 3.3 times from 2024 to 2028. The brief addresses US tariffs and does not apply directly to Turkish regulation; it does, however, give an international view of how large loads share network costs.

Key points

  1. Large-load tariff minimum demand thresholds range 0.3-150 MW, with 75% between 5 and 100 MW.
  2. Standardized minimum contract terms range 1-20 years; median rose from 5 years (pre-2025) to 12 years (since 2025).
  3. Minimum billing demand is typically a share of contract demand, median 80%.
  4. US data center demand grew 2.3x from 2018 to 2024 and could grow 3.3x from 2024 to 2028 (LBNL estimate).
  5. Collateral, exit fees and load ramp are also examined design elements.
  6. 2026 update of the January 2025 edition.

Using it in design

  • The cost model should support large-load tariff features: minimum billing demand (% of contract MW), contract term, ramp schedule and collateral.
  • Reflect take-or-pay exposure in lifecycle cost when the IT load ramps slowly.
  • Scenario the load ramp together with contract power and minimum billing demand.
  • Compare against local conditions before using US data as defaults for another country's tariff.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Finance, planning and design teams modelling data center energy contracts and lifecycle cost.

Publication details

Authors
Natalie Mims Frick; Peter Cappers; Goksin Kavlak; Long Lam; Ryan Hledik; Jadon Grove; Sebastian Rotella
Publisher
Lawrence Berkeley National Laboratory / The Brattle Group
Year
2026
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

LBNL (contractor-operated DOE laboratory) resource; not US-Gov public domain. Cited only.

Citation

Natalie Mims Frick; Peter Cappers; Goksin Kavlak; Long Lam; Ryan Hledik; Jadon Grove; Sebastian Rotella (2026). Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities - 2026 Update. Lawrence Berkeley National Laboratory / The Brattle Group. https://eta-publications.lbl.gov/sites/default/files/2026-08/rate_designs_large_loads_2026.08.10.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.