RegulationFree to read2019

Regulation on Unlicensed Electricity Generation in the Electricity Market (Elektrik Piyasasında Lisanssız Elektrik Üretim Yönetmeliği)

Original title Elektrik Piyasasında Lisanssız Elektrik Üretim Yönetmeliği

Enerji Piyasası Düzenleme Kurumu (EPDK)

EPDK regulation on electricity generation without a licence or company formation; relevant to emergency generator sets and on-site renewables in data centres.

On this page

Overview

This regulation sets out the rules of the Energy Market Regulatory Authority (EPDK) for generating electricity without a licence or company formation. For data centres it matters in two ways: emergency generator sets (imdat grupları) are explicitly licence-exempt, and on-site renewables, such as rooftop or facade PV for self-consumption at the same metering point, can be built under this regime with distribution-level connection rules.

Article 5(1)(a) lists emergency generator sets among the facilities exempt from pre-licence, licence and company-formation obligations. Article 5(1)(b) exempts plants operating with no connection of any kind to the transmission or distribution system, and Article 5(1)(ç) exempts renewable plants that consume all their output without feeding the grid, with generation and consumption at the same metering point. Under Article 7(1), plants connect to the distribution system at MV or LV depending on technical characteristics and existing capacity, and rejections must be reasoned in writing.

Article 7(2) sets an important limit: total LV-connected generation on a distribution transformer owned by the distribution company may not exceed 50% of the transformer rating. Related instruments include Article 14 of Law 6446 and the Electricity Market Connection and System Usage Regulation. This page is not the legal text; the current official text should be consulted in practice.

Key points

  1. Emergency generator sets (imdat grupları) are listed as exempt from pre-licence, licence and company-formation obligations (Article 5(1)(a)).
  2. Plants with no connection of any kind to the transmission or distribution system are exempt (Article 5(1)(b)).
  3. Renewable plants consuming all output without feeding the grid, with generation and consumption at the same metering point, are exempt (Article 5(1)(ç)).
  4. Plants connect at MV or LV depending on technical characteristics and existing capacity; rejections must be reasoned in writing (Article 7(1)).
  5. Total LV-connected generation on a DSO-owned distribution transformer may not exceed 50% of transformer rating (Article 7(2)).

Using it in design

  • In the generator module, tag standby diesel sets as 'imdat grubu': no generation licence, no export.
  • Enforce no parallel export unless a separate connection approval exists.
  • In the renewable module, model on-site PV as self-consumption behind the data centre meter.
  • Warn if LV injection exceeds 50% of the supplying distribution transformer.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Electrical engineers designing data centre power systems and standby generators, and regulatory compliance leads.

Related standards

  • 6446 sayılı Elektrik Piyasası Kanunu Madde 14
  • Elektrik Piyasası Bağlantı ve Sistem Kullanım Yönetmeliği
  • ISO/IEC 30134-3

Publication details

Authors
Enerji Piyasası Düzenleme Kurumu (EPDK)
Publisher
Enerji Piyasası Düzenleme Kurumu (EPDK)
Year
2019
Document number
RG 30772 (12.05.2019)
Document language
Turkish
Source type
Turkish regulation
Access
Free to read
Licence
Bibliographic reference only — the document is not redistributed here; confirm reuse terms at the original source
Original licence note

Official Turkish legislation published in the Resmî Gazete; FSEK (Law 5846) Art. 31 makes laws and regulations freely reproducible, but this library keeps it citation-only by policy. Text read from mevzuat.gov.tr (consolidated version as of 2026-11).

Citation

Enerji Piyasası Düzenleme Kurumu (EPDK) (2019). Elektrik Piyasasında Lisanssız Elektrik Üretim Yönetmeliği. Enerji Piyasası Düzenleme Kurumu (EPDK). RG 30772 (12.05.2019). https://www.mevzuat.gov.tr/mevzuat?MevzuatNo=31502&MevzuatTur=7&MevzuatTertip=5

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.