The European Commission's call for evidence, published with the September 2026 data centre energy efficiency package, announces a proposal for an EU Regulation setting minimum performance standards for data centres.

On this page

Overview

The document is European Commission DG ENER call for evidence Ares(2026)8908107, published alongside the data centre energy efficiency package of September 2026. Its purpose is to announce the rationale and scope of a proposed EU Regulation setting minimum performance standards (MPS) for data centres, and to gather views and evidence. It is published only as a Word document, so no PDF copy has been stored.

The call frames the problem under three heads: rising energy and water use, limited heat reuse and grid integration, and regulatory fragmentation. The legal basis is Article 194(2) of the Treaty on the Functioning of the European Union (TFEU), and EU action is justified as a way to avoid divergent national approaches. The proposed approach has three steps. The first is the reporting scheme (Delegated Regulation 2024/1364); the second is the rating scheme and label (cited in the text as Delegated Regulation 2026/7000); the third is minimum performance standards. The aim is that all new or retrofitted data centres meet minimum levels for energy efficiency, water use, waste-heat reuse, grid services and other selected sustainability criteria.

On the timetable, the likely instrument is a Regulation of the European Parliament and of the Council, with an indicative timetable of Q2 2027 and DG ENER Unit B2 in the lead. The impact assessment is expected in Q4 2026, with technical consultations through 2026 and targeted consultations via the EED Expert Group. This document is not yet a regulation; it contains no thresholds, and the scope may change until the proposal is published. For designers it is an early signal of which indicators (PUE, WUE, waste-heat reuse readiness, grid flexibility) may become binding.

Key points

  1. Likely instrument: a Regulation of the European Parliament and of the Council; indicative timetable Q2 2027; lead DG ENER Unit B2.
  2. Aim: all new or retrofitted data centres meet minimum levels for energy efficiency, water use, waste-heat reuse, grid services and other selected sustainability criteria.
  3. MPS are the third step after the reporting scheme (Delegated Regulation 2024/1364) and the rating scheme and label (Delegated Regulation 2026/7000 in the text).
  4. Legal basis is Article 194(2) TFEU; EU action is justified to avoid divergent national approaches.
  5. The impact assessment is expected in Q4 2026, with technical consultations through 2026 and targeted consultations via the EED Expert Group.
  6. The document is published only as a Word file.

Using it in design

  • Track this initiative as an upcoming rule pack; leave design headroom against likely MPS indicators (PUE, WUE, waste-heat reuse readiness, grid flexibility).
  • Keep thresholds configurable until the proposal is published.
  • Treat new and retrofitted facilities separately; the call covers both.
  • Build in now the metering needed to collect reporting (2024/1364) and rating data.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Bring standards pre-checks into your project

Review model-based TS EN 50600 and Tier pre-checks, missing inputs and items requiring engineering review in SoSo CAD.

Request a demo
Selected rule packs and findings in the SoSo CAD standards panel

Who should read it

Engineers designing or operating data centres in the EU, compliance leads and investors.

Related standards

  • Directive (EU) 2023/1791
  • Delegated Regulation (EU) 2024/1364
  • C(2026) 3472

Publication details

Authors
European Commission
Publisher
European Commission, DG ENER
Year
2026
Document number
Ares(2026)8908107
Document language
English
Source type
Government / public
Access
Free to read
Licence
EU reuse (2011/833/EU) — reuse permitted with acknowledgement of the source
Original licence note

Commission call for evidence; available only as DOCX in Cellar (two identical expressions, also b9745fbc-b5ac-11f1-81de-01aa75ed71a1), so no PDF was stored.

Citation

European Commission (2026). Call for evidence for an initiative with an impact assessment - Data centres in the EU: minimum performance standards (Ares(2026)8908107). European Commission, DG ENER. Ares(2026)8908107. http://publications.europa.eu/resource/cellar/ddfe0a5b-b5a9-11f1-81de-01aa75ed71a1.0023.01/DOC_1

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.