Metro Connect USA
About the event
US digital infrastructure business conference focused on fibre, data centre and wireless infrastructure deals, aimed at operators, investors and infrastructure developers.
Who it is for / why attend
For US digital infrastructure investors, operators and engineering firms. Alongside a dedicated Data Center Stage there are Design and Construction, Power and Energy and Data Center Investment summits; the main weight is fibre and dealmaking.
Venue
Dates and details are compiled from official organiser sources. Check the official website for the programme, admission requirements and registration status before making plans.
Read before you go
Explore the libraryTELKODER - Telekomünikasyon Operatörleri Derneği 2021
12. Ulaştırma ve Haberleşme Şûrası – Haberleşme Çalışma Grubu Sektör Öngörü Raporu: Veri Merkezleri (TELKODER Görüşleri)
In benchmarking views, use the quoted regional PUE (about 1.6) as a Turkish baseline.
- Average PUE is quoted as 1.59 worldwide and 1.62 in Turkey's region (DCD 2020).
Data Center Knowledge 2018
Preparing for the Worst: Compartmentalization in Data Center Capacity Planning
Model the campus as power blocks with block-level MEP independence and fire zones.
- The article is qualitative; the only numeric example is a 1 MW block.
ASHRAE 2011
2011 Gaseous and Particulate Contamination Guidelines for Data Centers (ASHRAE TC 9.9 White Paper)
Take corrosion-coupon classification as a site air-quality input; it drives humidity limits and filtration recommendations.
- It is listed in the bibliography of ASHRAE Handbook-HVAC Applications 2019, Chapter 20.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo