Overview

The manual centres on operating a critical-load distribution cabinet with an isolation transformer and a main breaker. It opens with safety rules and precautions, followed by a cybersecurity section stating that the product communicates over a network interface, that network security is the customer's responsibility, and that the system should sit on a private network. The ports in use are tabulated: SSH 22, Modbus/TCP 502, email ports, TFTP 69/udp for software upgrade and NTP 123/udp.

The startup chapter keeps checks before energization separate from the later steps. The contractor verifies phase rotation and grounding, conductor sizing against national electrical code rules, termination of building interface points, and that all breakers are OFF. On energizing, input voltage is compared with the label, output voltage is measured with a true RMS meter, and the 2.5 percent compensation taps are set if needed. After EPO and remote EPO circuits are verified, the secondary main breakers and then sub-feed and branch breakers are energized in sequence.

RELT (reduced energy let-thru) mode is a maintenance mode on the main breaker that activates programmable instantaneous overcurrent settings (Second I) and is switched with a key switch. The manual stresses that it may reduce but does not eliminate arc risk, and that an arc flash study should determine the hazard. The manual then covers the touchscreen LCD, network and protocol settings, the event log (timestamp, severity, active and acknowledged state) and the PowerView metering module.

The specification chapter lists ETL listing to UL 891 and sub-component standards. Five models are given: 400, 500, 600, 750 and 800 kVA, all at 480 V. The maintenance chapter recommends checking connection integrity, overheating and dirt accumulation and gives a bolt torque table. The document is product-specific and does not replace the instructions for the delivered configuration.

Key points

  1. Five models, all 480 V: 400 kVA (482 A, 600 A frame), 500 kVA (602 A, 800 A), 600 kVA (722 A, 1200 A), 750 kVA (903 A, 1200 A), 800 kVA (963 A, 1200 A).
  2. Before energizing, phase rotation, grounding, conductor sizing, interface board terminations and breaker OFF positions are verified and then double-checked.
  3. Output voltage is trimmed with the 2.5 percent compensation taps on the isolation transformer.
  4. An EPO is required: if the unit does not include one, a remote EPO must be installed (citing NEC 645.10).
  5. RELT mode may reduce but does not eliminate arcing risk; an arc flash study is needed to determine the hazard.
  6. PowerView communicates by Modbus RTU (RS-485) or Modbus TCP with slave ID 1; default RTU settings are 19200 baud, no parity, 1 stop bit.
  7. Operating temperature is 0 to 40 C and storage -25 to 55 C; noise is below 63 dBA up to 500 kVA, 65 dBA up to 700 kVA and 67 dBA up to 800 kVA.
  8. Elevation is limited to 3300 feet above sea level, and the unit is for clean, temperature and humidity-controlled indoor spaces.
  9. Torque values apply to SAE Grade 5 bolts: 1/4 in 8 N-m, 5/16 in 15 N-m, 3/8 in 27 N-m, 1/2 in 65 N-m.

Using it in design

  • Add the pre-energization checks to project documents as a checklist: phase rotation, grounding, conductor size, interface terminations, breaker positions.
  • When connecting the PDU to the BMS, put the Modbus settings and open ports into the network design and keep the device on a private network.
  • When writing RELT mode into the maintenance procedure, define the arc flash study result and working distances alongside it.
  • For cabinet selection, map kVA, full-load current and main breaker frame from the table, and check noise level and the 3300 ft elevation limit as site conditions.
  • Use the torque values only for the stated grade and sizes; do not generalise them to other equipment.

Who should read it

Electrical engineers, field teams and BMS integrators commissioning and operating critical-load distribution cabinets.

Document contents

  1. Important safety instructions
  2. General (cybersecurity)
  3. Startup (power-up, RELT mode, graphical user interface, security, system setup)
  4. Alarms and events
  5. Metering and monitoring
  6. Specifications
  7. System maintenance

Publication details

Authors
ABB
Publisher
ABB
Year
2023
Document number
94-1100-00002885 B
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

ABB (2023). TruFit Power Distribution Unit 400–800 kVA: User Manual. ABB. 94-1100-00002885 B. https://library.e.abb.com/public/3031b007be9f44bd85ca982dcf41798e/94-1100-00002885_TRUFIT_USER_MANUAL_400-800kVA_B_3.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace