Inter-Area Oscillation Damping in Data-Center-Integrated Power Systems
arXiv (author manuscript) · Ahmed Alfatlawi, Masoud H. Nazari
A Wayne State University NAPS 2026 paper: in a 700 MW hyperscale data centre, UPS demand response lifts inter-area damping from 1.29% to 2.24%, while the HVAC channel contributes nothing.
On this page
Overview
The study builds explicit dynamic models of a hyperscale data centre's HVAC and UPS subsystems and ties them into a small-signal stability framework. The aim is to see how data-centre demand response affects inter-area oscillations, the 0.1-2 Hz electromechanical modes in which generator groups in different regions swing against each other. The authors note that earlier work treated the data centre as one aggregated load and so missed the difference in timescales between its subsystems.
The model separates three timescales: IT load at 1-10 s, HVAC thermal dynamics at 5-30 s, and UPS power electronics at 10-100 ms. The test system is the IEEE 39-bus New England network with a 700 MW data centre split into 350 MW at each of buses 15 and 16. The load breaks down as IT 420 MW, HVAC 210 MW, auxiliaries 42 MW and UPS 28 MW. The combined model has 47 states.
The findings draw a sharp line. The UPS channel offers 20% of hardware capacity (5.6 MW) with a 50 ms time constant. The HVAC channel nominally offers 42 MW, but its 8 s thermal time constant attenuates the 1.94 Hz oscillation signal by about 98.97%, so it contributes essentially nothing. The UPS controller gain is tuned with a gradient-based algorithm to maximise the damping ratio of the critical mode.
The results come from simulation on the IEEE 39-bus test network and are not a field demonstration or a guarantee for every HVAC/UPS architecture. The authors propose IT workload throttling as future work. For a data-centre designer the value is a numerical case that the UPS is a fast resource that can be set aside for grid services, while the cooling plant is unsuited to such fast services.
Key points
- In the unloaded IEEE 39-bus system the dominant inter-area mode is at 1.94 Hz with 1.29% damping; damping below about 3% lets oscillations persist for tens of seconds.
- The 700 MW data centre adds 11.2% to system load; the minimum bus voltage falls from 0.982 pu to 0.965 pu, still above the 0.95 pu limit.
- The UPS fast channel is 5.6 MW (20% of 28 MW hardware) with a 50 ms time constant; the other 80% stays reserved for the UPS's primary ride-through role.
- The HVAC time constant is 8 s, about 15.5 times the oscillation period (0.515 s); the filter gain at 1.94 Hz is 0.0103, so 98.97% of the signal is attenuated.
- With demand response off, connecting the data centre dynamically changes damping by only 0.12%; with UPS demand response the minimum damping ratio rises to 2.24% (a 73.7% improvement).
- For a 100 MW load step, settling time drops from 14.39 s to 10.48 s (-27.2%) and peak COI frequency deviation from 0.2233 Hz to 0.1929 Hz (-13.6%).
- The UPS channel saturates at its 5.6 MW limit through the whole transient; HVAC output is zero.
- The UPS gain (K = 3571) is chosen by gradient ascent; the phase lag of -31.4 degrees at 1.94 Hz is corrected by a lead-lag compensator (Tlead 0.085 s, Tlag 0.020 s).
- According to the authors, the improvement needs only a firmware-level gain adjustment and no extra hardware.
Using it in design
- If the site is to offer fast grid services (frequency or oscillation damping), assign that role to the UPS power electronics, not to HVAC; the cooling chain responds on a timescale of seconds.
- Limit the share of UPS capacity assigned to demand response (20% in the study) and state in the specification that the remainder is kept for ride-through.
- Ask the UPS vendor whether the grid-side control gain and phase compensation are adjustable, and how that affects warranty and certification.
- In a large-load interconnection study, model the site as separate IT, HVAC and UPS subsystems rather than one fixed load, and assess small-signal stability together with the grid operator.
- Check the results against the oscillation modes at your own point of connection before relying on them; the paper is a test-network simulation.
Who should read it
Electrical engineers working on grid interconnection and grid services, UPS product and control designers, and hyperscale campus planners.
Document contents
- Introduction
- Data-center-integrated power system configuration
- Small-signal dynamic modeling and control design
- Simulation results
- Conclusion
Publication details
- Authors
- Ahmed Alfatlawi; Masoud H. Nazari
- Publisher
- arXiv (author manuscript)
- Year
- 2026
- Document number
- arXiv:2607.27575v1
- Document language
- English
- Source type
- Scientific
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Article-specific arXiv view-license link grants arXiv a non-exclusive distribution right; this is not general commercial redistribution permission.
Citation
Ahmed Alfatlawi; Masoud H. Nazari (2026). Inter-Area Oscillation Damping in Data-Center-Integrated Power Systems. arXiv (author manuscript). arXiv:2607.27575v1. https://doi.org/10.48550/arXiv.2607.27575