Technical guideFree to read2024

New Construction Building Commissioning Best Practices

Building Commissioning Association

The Building Commissioning Association's January 2024 guide describes new-construction commissioning in four phases, pre-design, design, construction and operations, anchored on the Owner's Project Requirements (OPR).

On this page

Overview

The guide is the January 2024 update of BCxA best practices for new construction commissioning (NCCx). It defines the basic purpose of commissioning as documented confirmation that building systems are designed, installed and function in compliance with the criteria in project documents. It covers practices beyond the minimum required by codes and complements the BCxA Essential Attributes, which set the minimum standard of care.

The process is split into four phases, each with objectives, team and activities: pre-design (writing the Owner's Project Requirements, selecting the team), design (Basis of Design, commissioning plan, design reviews), construction (plan updates, submittal reviews, controls integration meetings, construction checklists, functional performance tests and an issues log) and operations (issue closure, training, seasonal and deferred tests, ongoing performance).

Construction-phase practices include integrating the commissioning schedule with the construction schedule, reviewing controls, fire alarm and emergency power submittals, approving the TAB plan, the contractor completing checklists such as generator load-bank tests, and confirming readiness before functional performance tests (FPTs). FPTs are repeatable, step-by-step procedures with acceptance criteria set in advance.

The guide is process-oriented; it does not define which systems to commission or the rigour for specific equipment. It is not a data-centre document, but it gives a general framework for the commissioning role and deliverables in design and construction. Completing FPTs under seasonal weather and full-load conditions is recommended as best practice.

Key points

  1. January 2024 BCxA update; best practices that complement the Essential Attributes (minimum standard).
  2. Four phases: pre-design, design, construction, operations, each with objectives, team and activities.
  3. Commissioning is described as the only role besides the owner engaged through design, construction, delivery and optimisation.
  4. The commissioning schedule is integrated with the construction schedule; kickoff, regular coordination meetings and site visits are held.
  5. Controls integration meetings for controls, fire alarm and emergency power submittals take place before approval.
  6. FPTs are repeatable step-by-step procedures testing every function, mode, sequence and interaction; the contractor pre-tests before witnessed tests.
  7. The Issues and Resolution Log records deficiencies and their resolution.
  8. FPTs under full load and seasonal conditions are recommended; remaining tests become deferred and seasonal tests during operations.

Using it in design

  • On a data-centre project, appoint the commissioning provider at pre-design and write the OPR as the basis of commissioning scope.
  • Plan controls integration meetings ahead of approval of controls, fire alarm and generator submittals.
  • Submit FPT procedures to the design team before equipment installation and require the contractor to pre-test.
  • Plan deferred and seasonal tests for the operations phase where full IT load is not available.
  • Make the issues log part of the handover package and involve the operations team in training and handover.

Who should read it

Commissioning authorities, project owners and engineers planning the commissioning process with design and construction teams.

Document contents

  1. Executive Summary
  2. 1. Pre-Design Phase
  3. 2. Design Phase
  4. 3. Construction Phase
  5. 4. Occupancy and Operations Phase
  6. BCxA Essential Attributes 2018 Update

Publication details

Authors
Building Commissioning Association
Publisher
Building Commissioning Association
Year
2024
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Publisher public source inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only. TinyFish read the full publisher PDF text; direct local download returned HTML, not a PDF. Local binary-copy verification is therefore unavailable.

Citation

Building Commissioning Association (2024). New Construction Building Commissioning Best Practices. Building Commissioning Association. https://www.bcxa.org/uploads/resources/bcxa1005bestpractice-newconstructionbuildingcommissioning-v3.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Standards pre-assessment in SoSo CAD

Run TS EN 50600 and Tier pre-checks on the model, with missing inputs and items for engineering review listed separately.

Selected rule packs and findings in the SoSo CAD standards panel

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.