AI Factory Reference Architecture: 60 MW, Reference D60-W: Water-Cooled Chillers with Dry Coolers

Daikin Applied

Daikin Applied's cooling reference for a 60 MW AI factory: a 92% liquid / 8% air split, six deployable units, dry coolers and a waterside economizer with three operating modes.

On this page

Overview

The guide presents a cooling reference architecture for project-specific integration with the NVIDIA DSX platform and Vera Rubin NVL72. The plant consists of six deployable units (DUs), each with a 10 MW operating allocation, serving a total 60 MW IT load. The design boundary is set for Ashburn, Virginia: summer dry bulb 39.8°C, coincident wet bulb 28.1°C, winter dry bulb -12.9°C.

The architecture rests on two temperature loops. The high-temperature facility liquid loop runs at 37°C supply and 47°C return, while rack liquid is separated through the CDUs at 41°C supply and 51°C return. A separate low-temperature water loop for the rack containment units (RCUs) runs at 22°C supply and 33.11°C return. The load split is 92% liquid (9.2 MW) and 8% air (0.8 MW) per unit.

Heat rejection uses dry coolers and a waterside economizer, with mechanical cooling from oil-free magnetic-bearing centrifugal chillers. Dry, hybrid and mechanical modes are chosen by comparing dry cooler leaving fluid plus economizer approach against thresholds of 41°C and 47°C. Under full economization the facility supply resets to 41°C, giving 45°C rack supply through the CDU.

Redundancy is stated at two levels: each DU carries 6+1 CDUs and a 2N target for RCU fans and coils, while the central plant uses N+2. The document is an engineering starting point, not a catalogue. Some components, including the CDUs and dry coolers, are marked as available in 2027-H2, so it should not be read as proof of a deployed system.

Key points

  1. Total 60 MW IT load across 6 deployable units, each with a 10 MW operating allocation and a 13.8 MW reference thermal capacity.
  2. Facility liquid 37°C supply / 47°C return, rack liquid 41°C / 51°C, RCU water 22°C / 33.11°C, condenser water 44.8°C / 50.4°C.
  3. Per-unit load split of 9.2 MW liquid and 0.8 MW RCU air; across the plant 55.2 MW liquid and 4.8 MW air.
  4. Each DU has 7 x 2.3 MW CDUs (6 duty + 1 standby) at a 4°C approach, with 128 reference rack positions and 4 scalable units.
  5. High-temperature loop: 8 x 10 MW WME Quad chillers (6+2) and 23 multi-V dry coolers (21+2, 3.0 MW each).
  6. Low-temperature loop: 6 x 1.4 MW WME Single chillers (4+2) and 4 dry coolers (2+2, 3.0 MW each).
  7. Mode 1 dry cooling: dry cooler leaving fluid + HX approach <= 41°C, compressors off; Mode 2 hybrid: 41-47°C; Mode 3 mechanical: >= 47°C.
  8. CDUs span 1-3.5 MW with 25 µm filtration and 50 psi (3.45 bar); CDUs and dry coolers are marked available in 2027-H2.
  9. Chillers use R-513A or R-515B, with RideThrough and RapidRestore for fast cooling recovery after power disturbances.

Using it in design

  • Compare dry cooler leaving temperature plus economizer approach hourly against 41°C and 47°C using your own climate data to estimate annual dry, hybrid and mechanical hours.
  • Check the 41°C / 51°C rack loop against the 37°C / 47°C facility loop together with the 4°C CDU approach.
  • Compare 6+1 CDU unit redundancy and N+2 chiller and dry cooler plant redundancy with your own availability target.
  • Decide whether the air share (8% here) justifies a separate, lower-temperature chiller group for the RCU water loop.
  • Write components dated 2027-H2 explicitly into the project schedule and spares plan.

Who should read it

Mechanical engineers and investment decision makers designing liquid-cooled central plants for high-density AI halls.

Document contents

  1. Introduction to the AI Factory Infrastructure
  2. The Daikin Data Center Infrastructure
  3. Design Boundary Conditions
  4. Deployable Unit Architecture
  5. AI Factory Architecture and Modes of Operation
  6. Mode 1: Dry Cooling
  7. Mode 2: Hybrid Cooling
  8. Mode 3: Mechanical Cooling
  9. Overall System Loads and Redundancy Strategy
  10. Coolant Distribution Unit
  11. Rack Containment Units (RCU)
  12. Water Cooled Chiller Solutions
  13. Oil-Free Technology, RideThrough and RapidRestore

Publication details

Authors
Daikin Applied
Publisher
Daikin Applied
Year
Year not stated
Document number
D60-W
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official publisher landing page opened at https://www.daikinapplied.com/industry-solutions/data-center-solutions/ and its linked PDF downloaded as HTTP 200 application/pdf. No open redistribution licence found. Publication year unspecified; future component availability is recorded explicitly. Citation and original summary only.

Citation

Daikin Applied AI Factory Reference Architecture: 60 MW, Reference D60-W: Water-Cooled Chillers with Dry Coolers. Daikin Applied. D60-W. https://tahoeweb.daikinapplied.com/api/general/DownloadDocumentByName/media/Daikin%20Reference%20Architecture%20D60-W%2060MW.pdf/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.