Under Section 13 of Germany's EnEfG, data-centre operators with at least 300 kW non-redundant nominal connected load report the previous calendar year's data to the federal register and publish it by 31 March each year.

On this page

Overview

The Federal Office for Energy Efficiency (BfEE) page explains that the Energy Efficiency Act (EnEfG) explicitly addresses data centres. It contains rules on waste-heat use, setting up energy and environmental management systems and the duty to report to the Energy Efficiency Register for Data Centres (RzReg).

Under Section 13(1) sentence 1 and Annex 3 of the EnEfG, operators of data centres with a non-redundant nominal connected load of 300 kilowatts or more must, as a rule, publish information on the preceding calendar year and submit it to the federal government by 31 March each year. A guide to the data points and an FAQ are on the RzReg landing page; data are submitted through the RzReg reporting portal.

An operator can meet the publication duty by publishing on the register's public platform (Public RzReg), which holds annual reports, aggregated data and further information. The register is run by the Federal Office for Economic Affairs and Export Control (BAFA).

Key points

  1. The EnEfG covers waste-heat use, energy and environmental management systems and register reporting for data centres.
  2. The reporting threshold is 300 kW non-redundant nominal connected load (EnEfG Section 13, Annex 3).
  3. Previous-calendar-year information is published and sent to the federal authority by 31 March each year.
  4. Data are submitted through the RzReg reporting portal; the guide and FAQ are on the landing page.
  5. The publication duty can be met by publishing on the public RzReg platform.
  6. The public platform holds annual reports and aggregated data.

Using it in design

  • For a German facility, check the reporting threshold against non-redundant nominal connected load (300 kW); redundant capacity does not count toward it.
  • Define the data points needed for annual reporting (from the RzReg guide) in the metering and logging system from the start.
  • Add the 31 March date and previous-calendar-year data to the operations calendar.
  • Include waste-heat use, energy management and environmental management system duties in the design scope.

Who should read it

Operators of data centres in Germany, their design teams and compliance managers tracking EnEfG reporting duties.

Document contents

  1. Energy efficiency register for data centres
  2. Data reporting
  3. Published data
  4. Contact

Publication details

Authors
Federal Office for Energy Efficiency (BfEE / BAFA)
Publisher
Federal Office for Energy Efficiency (BfEE / BAFA)
Year
Year not stated
Document language
German
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official public publisher text inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.

Citation

Federal Office for Energy Efficiency (BfEE / BAFA) Energieeffizienzregister für Rechenzentren: reporting guidance. Federal Office for Energy Efficiency (BfEE / BAFA). https://bfee-online.de/BfEE/DE/Effizienzpolitik/Energieeffizienzregister_Rechenzentren/energieeffizienzregister_rechenzentren_node.html

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.