Germany's Federal Environment Agency (UBA) April 2025 guide builds on Blue Angel DE-UZ 228: for data centres commissioned after 2024 it recommends PUE ≤ 1.25 and CER > 9 as tender criteria.

On this page

Overview

The guide helps public purchasers buy data-centre services with environmental criteria and is based on the criteria of the Blue Angel ecolabel DE-UZ 228 (January 2023). The scope is four procurement types: building a server room or data centre, colocation for one's own IT, hosting IT in an external data centre and cloud services or SaaS. For each type it gives subject-matter requirements, contract performance conditions and bid evaluation recommendations; four supplier questionnaires accompany the guide.

For a construction tender the criteria are: a metering concept for technical building services, IT and technical equipment inventories, halogen-free refrigerants (systems up to 10 kWth excepted), SF6-free electrical switchgear, design for annual-average PUE ≤ 1.25 (DIN EN 50600-4-2 category 2), CER > 9 (DIN EN 50600-4-7) and ERF > 0 for waste-heat use. At 100 kW connected load and above the centre must be prepared for external use of waste heat, meaning connections must exist.

For colocation and hosting, PUE and CER thresholds step with commissioning date: PUE ≤ 1.25 from 2024, ≤ 1.30 for 2019 to 2023, ≤ 1.50 for 2015 to 2018 and ≤ 1.60 for 2014 and earlier; CER > 9, > 8, > 7 and > 5 respectively. Newly commissioned centres get relaxed values for the first two years (PUE ≤ 1.50 in year one, ≤ 1.40 in year two). For hosting, servers must reach ITEUSV ≥ 20% average CPU use over 12 months; for cloud services, renewable energy, server utilisation and public information are required. Over-performance is scored in bid evaluation.

Key points

  1. The guide is based on Blue Angel DE-UZ 228 (January 2023) criteria and was completed in April 2025.
  2. Four procurement objects: construction, colocation, hosting, cloud or SaaS.
  3. PUE thresholds for colocation and hosting: ≤ 1.25 from 2024; ≤ 1.30 for 2019 to 2023; ≤ 1.50 for 2015 to 2018; ≤ 1.60 for 2014 and earlier (DIN EN 50600-4-2, category 2).
  4. CER thresholds: > 9 from 2024; > 8 for 2019 to 2023; > 7 for 2015 to 2018; > 5 for 2014 and earlier (DIN EN 50600-4-7).
  5. In the first year of operation PUE ≤ 1.50 and in the second ≤ 1.40 is accepted; CER > 5 is allowed in year one.
  6. Halogen-free refrigerants are required (systems up to 10 kWth excepted); new switchgear must be SF6-free.
  7. At 100 kW connected load and above the data centre must be ready for external waste-heat use and have ERF > 0; ERF (DIN EN 50600-4-6) is given as a design value.
  8. For hosting, servers must average ITEUSV ≥ 20% CPU use over 12 months (ISO 30134-5).

Using it in design

  • In public tenders or similar purchases, set PUE, CER and ERF as both exclusion and scoring criteria and request design values with the planning documents.
  • Calculate design PUE below 1.25 per DIN EN 50600-4-2 category 2; since heat pump and network pump energy for waste-heat extraction is excluded from PUE, fit separate meters.
  • Write halogen-free refrigerants and SF6-free switchgear into the cooling and electrical specification.
  • For facilities above 100 kW, reserve waste-heat connection points in the design and calculate the design ERF.
  • When choosing a colocation provider, compare PUE and CER thresholds by commissioning year and the two-year exception.

Who should read it

Public bodies buying data-centre services, consultants drafting tender specifications and engineers designing to Blue Angel criteria.

Document contents

  1. Introduction and structure of the guide
  2. Scope
  3. Background to the product group
  4. Including environmental aspects in the specification and verification
  5. Environmental requirements for building a server room or data centre
  6. Environmental requirements for colocation of own IT
  7. Environmental requirements for hosting IT in an external data centre
  8. Environmental requirements for cloud services or SaaS
  9. Annex: Scope of Blue Angel DE-UZ 228, description of the four procurement objects, mapping table

Publication details

Authors
Umweltbundesamt
Publisher
Umweltbundesamt
Year
2025
Document language
German
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

PDF p.4 expressly permits copying and other use of all guide contents provided they are not distorted or otherwise misused. This is the publisher's stated permission, not an inferred Creative Commons licence.

Citation

Umweltbundesamt (2025). Leitfaden zur umweltfreundlichen öffentlichen Beschaffung: Rechenzentren und Rechenzentrums-Dienstleistungen. Umweltbundesamt. https://www.umweltbundesamt.de/system/files/medien/479/publikationen/uba_beschaffungsleitfaden_rechenzentren_und_rechenzentrums-dienstleistungen.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current