IJEPES 2026 paper: using Alibaba Cluster Trace data, the LAD-Flex strategy defers high-latency jobs and deferred up to 22% of load during flexibility windows in a one-week case.

On this page

Overview

The paper notes that data centres, especially those offering machine learning services, pose a growing challenge to power system stability and are also an underused source of demand-side flexibility. It presents a quantitative framework to assess and activate flexibility potential by deferring non-critical, high-latency IT workloads. Real workload data comes from the Alibaba Cluster Trace: tasks are classified by observed queuing latency, and a power model estimates the energy consumption of different latency groups.

The proposed Latency-Aware Deferral for Flexibility (LAD-Flex) strategy temporarily reduces modelled IT-side power demand on aggregator request while maintaining quality of service, accounting for estimated task duration, latency thresholds and flexibility window constraints. In a one-week case study, up to 22% of load could be deferred during flexibility windows, and more than 20% of estimated GPU-side power came from tasks with deferrable latency. An optimisation framework also identifies the notification period that maximises flexibility value under time-sensitive pricing. The results show that data centres coupled with an aggregator can reliably take part in short-notice demand response.

Key points

  1. Alibaba Cluster Trace data was used to classify tasks by queuing latency and build a power model.
  2. The LAD-Flex strategy temporarily reduces IT-side power on aggregator request while maintaining quality of service.
  3. In a one-week case, up to 22% of load could be deferred during flexibility windows.
  4. More than 20% of estimated GPU-side power comes from tasks with deferrable latency.
  5. The optimisation framework identifies the notification period that maximises flexibility value under time-sensitive pricing.

Using it in design

  • In AI and machine learning clusters, classify workloads by latency tolerance and record the deferrable share as flexibility capacity.
  • In demand response contracts with the grid or an aggregator, optimise the notification period as an economic parameter of the contract.
  • Evaluate the flexibility target together with facility power and cooling capacity planning; the paper's results rest on modelled IT-side demand.
  • Define workload deferral so that it is compatible with service level agreements.

Who should read it

Operators, aggregators and power system researchers planning data-centre demand response and flexibility services.

Publication details

Authors
Adriano Caprara; Ying Yu; Fei Teng; Adrià Junyent-Ferré; Eduard Bullich-Massagué; Mònica Aragüés-Peñalba
Publisher
International Journal of Electrical Power & Energy Systems (Elsevier BV)
Year
2026
Document language
English
Source type
Scientific
Access
Free to read
Licence
CC BY 4.0: share with attribution
Original licence note

Publisher-deposited Crossref licence metadata: http://creativecommons.org/licenses/by/4.0/ (OpenAlex: cc-by); landing page blocks automated fetch, abstract read via Crossref/OpenAlex. Round 1 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

Adriano Caprara; Ying Yu; Fei Teng; Adrià Junyent-Ferré; Eduard Bullich-Massagué; Mònica Aragüés-Peñalba (2026). Data center workload flexibility for power system demand response: Evidence from Alibaba traces. International Journal of Electrical Power & Energy Systems (Elsevier BV). https://doi.org/10.1016/j.ijepes.2026.111940

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.