A seamless start-up for a hybrid uninterruptible power supply based on a diesel generator and supercapacitor energy storage
Results in Engineering (Elsevier BV) · Ahmad M.A. Malkawi, Mohammed I. Alawneh et al.
A Results in Engineering (2024) paper: a DC-bus supercapacitor carries most of the load at grid failure, then adaptive droop hands the load to the diesel generator; MATLAB/Simulink results show a seamless start-up.
On this page
Overview
Diesel generator systems are a common source of uninterruptible power for critical loads, but their slow dynamics, especially at start-up, delay the supply of power. Supercapacitors offer fast response and high power density, with low energy density. The paper uses supercapacitor storage to cover the power gap caused by the generator's slow dynamic behaviour.
The hybrid UPS energy management uses adaptive droop control, combining DC bus signalling with droop control. Power sharing between the generator and the supercapacitor is adjusted dynamically by changing the droop factor of the supercapacitor converter. At grid failure the supercapacitor takes most of the load with a relatively small droop factor; the factor then increases, reducing its share and moving the load to the generator.
MATLAB and Simulink simulations show the hybrid UPS working through short and long grid failures with a seamless start-up. According to the authors, the approach can improve the reliability and efficiency of backup power systems. The related standard is ISO 8528.
Key points
- The diesel generator's slow dynamics delay the supply of power during start-up.
- A supercapacitor gives fast response and high power density, with low energy density.
- The management strategy is adaptive droop control combining DC bus signalling and droop control.
- At the fault the supercapacitor takes most of the load with a small droop factor; the factor then rises and the load shifts to the generator.
- MATLAB/Simulink results show seamless start-up for short and long grid failures.
Using it in design
- Short-duration stores (supercapacitors, flywheels) can complement battery autonomy by bridging generator start time.
- In autonomy sizing, cover generator start time and load acceptance behaviour.
- Add power sharing between generator and storage through DC bus signalling and adjustable droop to the control-logic specification.
- In generator selection, verify the ISO 8528 performance class and load acceptance steps together with the hybrid design.
Who should read it
Electrical engineers designing backup power systems that combine generators and UPS, and energy storage control developers.
Related standards
- ISO 8528
Publication details
- Authors
- Ahmad M.A. Malkawi; Mohammed I. Alawneh; Ahmad Bashaireh
- Publisher
- Results in Engineering (Elsevier BV)
- Year
- 2024
- Document language
- English
- Source type
- Scientific
- Access
- Free to read
- Licence
- CC BY-NC-ND 4.0: share unaltered with attribution for noncommercial purposes
Original licence note
Publisher-deposited Crossref licence metadata: http://creativecommons.org/licenses/by-nc-nd/4.0/ (OpenAlex: cc-by-nc-nd); landing page blocks automated fetch, abstract read via Crossref/OpenAlex. Non-commercial licence: link/cite only in a commercial product.
Citation
Ahmad M.A. Malkawi; Mohammed I. Alawneh; Ahmad Bashaireh (2024). A seamless start-up for a hybrid uninterruptible power supply based on a diesel generator and supercapacitor energy storage. Results in Engineering (Elsevier BV). https://doi.org/10.1016/j.rineng.2024.103418
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.