Enel's ST3 series three-phase static transfer switch (STS): twelve current ratings from 50 to 2500 A, transfer time <=5 ms for synchronous and <=10 ms for asynchronous sources, efficiency >=99%.

On this page

Overview

The one-page specification table presents Enel's ST3 series of three-phase static transfer switches. The series comes in twelve current ratings: 50, 100, 200, 250, 300, 400, 630, 800, 1000, 1200, 1500 and 2500 A, with 3 or 4 poles. Input voltage is 380-400-415 V, 3-phase plus neutral; the input voltage window is +/-25% and the frequency window +/-10%, both adjustable, with a rated frequency of 50/60 Hz.

Transfer uses break-before-make switching, with no short circuit between the sources. Transfer time is <=5 ms between synchronous sources and <=10 ms between asynchronous ones; transfer can be automatic or manual. Crest factor is 3.5:1.

Overload capacity is given as 60 min at 110%, 10 min at 130%, 2 min and 1 min at 150%, 10 s and 2 s at 200%, and 250 ms and 100 ms at 500%. Protections are overload, SCR fault detection, electronic short circuit and phase-sequence error. Switching is three-phase and control is microprocessor-based. UPS compatibility is stated for the C, D and E series.

General data: efficiency >=99%, forced-air cooling, optional remote monitoring panel. Operating temperature 0-40 °C, storage -10 to +50 °C, relative humidity 0-95% non-condensing, altitude <=2000 m, noise in four steps of <50, <55, <60 and <70 dB(A). Protection is IP20 and colour RAL9005. Safety is EN 62310-1, EMC EN 62310-2, and service life is 10 years.

Key points

  1. Twelve current ratings: 50, 100, 200, 250, 300, 400, 630, 800, 1000, 1200, 1500 and 2500 A; 3 or 4 poles.
  2. Input 380-400-415 V 3-phase + N; voltage window +/-25%, frequency window +/-10% (adjustable).
  3. Transfer time <=5 ms (synchronous sources), <=10 ms (asynchronous); break before make.
  4. Overload: 110% 60 min, 130% 10 min, 150% 2 min/1 min, 200% 10 s/2 s, 500% 250/100 ms.
  5. Crest factor 3.5:1; efficiency >=99%; forced-air cooling.
  6. Protections: overload, SCR fault detection, electronic short circuit, phase-sequence error.
  7. Operation 0-40 °C, humidity 0-95%, altitude <=2000 m; IP20.
  8. Standards EN 62310-1 and EN 62310-2; service life 10 years.

Using it in design

  • In a dual-source feed, select the STS current rating against the load current and the 110% / 60 min overload limit, using the next higher rating step.
  • If the sources are not synchronous (for example UPS and generator), compare the <=10 ms transfer time with the load ride-through.
  • For downstream protection selectivity, assess the 250 ms (and 100 ms) limit at 500% together with breaker curves.
  • In the electrical room layout, allow for forced-air cooling, IP20 and the 2000 m altitude limit.
  • With a 10-year service life, include a renewal plan in the operating budget.

Who should read it

Electrical engineers designing dual-source power distribution, data-centre operators and UPS integrators selecting STS equipment.

Document contents

  1. Voltage (input, frequency, poles, crest factor)
  2. Transfer (mode, time, methods)
  3. Overload capacity
  4. General (protection, control, UPS compatibility, efficiency, cooling)
  5. Environment
  6. Physical characteristics
  7. Standards
  8. Service life

Publication details

Authors
Enel
Publisher
Enel
Year
Year not stated
Document language
Turkish
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Enel ST3 Serisi teknik özellikler. Enel. https://enel.com.tr/wp-content/uploads/2019/11/ST3-Serisi-1b.jpg

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.