Comparative Analysis of Large Load Interconnection Requirements Across U.S. Transmission Entities
CIGRE US National Committee, 2026 Grid of the Future Symposium (arXiv preprint) · Rafi Zahedi, Rahul Anilkumar et al.
A comparison of large-load interconnection rules across eleven U.S. entities (AEP, Ameren, CAISO, Dominion, Duke, ERCOT, LIPA, MISO, PJM, Southern Company, SPP) under seven categories, including fault ride-through, curtailment, dispatchability, power quality and reactive power.
CC0 1.0: public domain dedication; free to reuse
On this page
Overview
The rapid growth of large loads, especially AI-driven data centres, is creating unprecedented demands on the North American electric grid. Data centres account for nearly 80% of large-load interconnection requests in the Western Interconnection, and DOE projects U.S. data-centre use of 325-580 TWh by 2028. Despite this, technical interconnection requirements for large loads have not yet matured and contain gaps. The paper compares eleven entities across seven technical categories: large-load definition, load data and modelling, fault ride-through, load curtailment and shedding, dispatchability, power quality and reactive power control.
The lowest large-load threshold is 10 MW (SPP, loads at 69 kV); LIPA uses 20 MW and 50 MW is the most common threshold. ERCOT's proposed VRT: continuous 0.90-1.10 pu, current during disturbances not above 150% of normal maximum for no more than 0.5 s, and return to at least 90% of pre-disturbance consumption within 2 s after voltage exceeds 0.90 pu. SPP requires staying connected through at least six fault-clearing attempts within 90 s and prohibits constant-power control during disturbances; Dominion requires riding through at least six reclosing attempts of 50-70 ms. CAISO requires up to 6.0 s ride-through in the 0.70-0.90 pu band, roughly 3× the 2.0 s required by ERCOT, SPP, MISO and LIPA; all five numeric envelopes permit tripping above 1.20 pu.
Ramp-rate limits: Southern 20 MW/min, Duke 10 MW/min, MISO 30 MW/min (plus 10 MW max change in a sliding 5 s window), SPP 20 MW/min, LIPA 20 MW/min, CAISO 20 MW/min. Southern Company FFT oscillation limit: 10 MW max per 0.1 Hz bin for 0.1-5 Hz and 2.5 MW for 5-55 Hz; LIPA caps any two adjacent bins at 10 MW and all bins at 20 MW in 0.1-5 Hz, and 3.5 MW in 5-55 Hz. MISO's proposal requires withstanding three voltage disturbances within 10 s and phase-angle jumps up to 25 degrees.
The maturity assessment finds LIPA covering all categories and Dominion/Duke close behind, while dispatchability and oscillation limits remain inconsistent. The authors argue that on-site generators and BESS let hyperscale sites act as grid resources rather than only loads. Limits: rules are evolving quickly and measurement methods differ between entities; it is a preprint.
Key points
- Data centres make up nearly 80% of large-load interconnection requests in the Western Interconnection; DOE projects U.S. data-centre use of 325-580 TWh by 2028.
- The lowest large-load threshold is 10 MW (SPP, loads at 69 kV); LIPA uses 20 MW and 50 MW is the most common threshold.
- ERCOT's proposed VRT: continuous 0.90-1.10 pu, current during disturbances not above 150% of normal maximum for no more than 0.5 s, and return to at least 90% of pre-disturbance consumption within 2 s after voltage exceeds 0.90 pu.
- SPP requires staying connected through at least six fault-clearing attempts within 90 s and prohibits constant-power control during disturbances; Dominion requires riding through at least six reclosing attempts of 50-70 ms.
- CAISO requires up to 6.0 s ride-through in the 0.70-0.90 pu band, roughly 3× the 2.0 s required by ERCOT, SPP, MISO and LIPA; all five numeric envelopes permit tripping above 1.20 pu.
- Ramp-rate limits: Southern 20 MW/min, Duke 10 MW/min, MISO 30 MW/min (plus 10 MW max change in a sliding 5 s window), SPP 20 MW/min, LIPA 20 MW/min, CAISO 20 MW/min.
- Southern Company FFT oscillation limit: 10 MW max per 0.1 Hz bin for 0.1-5 Hz and 2.5 MW for 5-55 Hz; LIPA caps any two adjacent bins at 10 MW and all bins at 20 MW in 0.1-5 Hz, and 3.5 MW in 5-55 Hz.
- MISO's proposal requires withstanding three voltage disturbances within 10 s and phase-angle jumps up to 25 degrees.
Using it in design
- Design data-centre UPS and load control to the most restrictive entity's requirement: 6.0 s ride-through at 0.70-0.90 pu (CAISO), six fault-clearing attempts within 90 s (SPP), six 50-70 ms reclosings (Dominion), and the ban on constant-power control (SPP).
- Make ramp limits (10-30 MW/min) and FFT oscillation limits (Southern: 10 MW per bin at 0.1-5 Hz, 2.5 MW at 5-55 Hz) inputs to the load profile and storage sizing.
- Add the post-disturbance recovery target (ERCOT proposal: at least 90% within 2 s) to UPS and load-reconnection logic.
- Verify the large-load definition (10-50 MW thresholds) early in application scoping.
Who should read it
Grid engineers and designers preparing large data-centre load interconnection across several U.S. entities.
Document contents
- 1. Introduction
- 2. Comparative Findings of U.S. Transmission Entities (2.1 Large load definition, 2.2 Load data and modeling, 2.3 Fault ride-through, 2.4 Load curtailment and load shedding, 2.5 Dispatchability, 2.6 Power quality, 2.7 Reactive power control)
- 3. Conclusion
Related standards
- IEEE 2800-2022
- NERC PRC-029-1
- ITI (CBEMA) curve
- IEEE 519
- IEEE 1453
Read the document
large-load-interconnection-requirements-us-2026.pdf
CC0 1.0: public domain dedication; free to reuse
The document is provided unaltered because its licence permits redistribution.
Publication details
- Authors
- Rafi Zahedi; Rahul Anilkumar; Amin Zamani
- Publisher
- CIGRE US National Committee, 2026 Grid of the Future Symposium (arXiv preprint)
- Year
- 2026
- Document number
- arXiv:2610.36645
- Document language
- English
- Source type
- Scientific
- Access
- Open licence (downloadable)
- Licence
- CC0 1.0: public domain dedication; free to reuse
- Licence evidence
- arxiv.org
Original licence note
arXiv record licence is http://creativecommons.org/publicdomain/zero/1.0/ (CC0, checked via arXiv OAI-PMH)
Citation
Rafi Zahedi; Rahul Anilkumar; Amin Zamani (2026). Comparative Analysis of Large Load Interconnection Requirements Across U.S. Transmission Entities. CIGRE US National Committee, 2026 Grid of the Future Symposium (arXiv preprint). arXiv:2610.36645. https://doi.org/10.48550/arXiv.2610.36645
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.