Topic

Site planning

Review publications on site selection, building layouts and the physical arrangement of data centre infrastructure. Read about capacity, environmental conditions, access and expansion in the context of your project.

Key numbers

Values hold under the conditions stated in each source. Read the cited page before using one in your project.

QuantityValueConditionSource
Room area per rack location (estimate)2.6 sq meters / rackRoom area divided by this value; 28 sq ft / rackSchneider Electric, 2015 · Sec. Number of rack locations, p. 5
Utility connection lead time (survey)1-2 years52% of respondents; 32% say over 2 yearsTurner & Townsend, 2026 · Press release 26 Oct 2026
Freeboard above flood elevation at critical facilities1 to 3 feetOften appliedFEMA, 2007 · p. 61
Average global construction cost (2025)$10.7M per MWShell and core; 2026 forecast $11.3M/MWJLL, 2026 · 'Construction costs increasing at 7%…

Design checklist

  1. At critical-facility data centres, place generators, ATS, fuel tanks and pumps above the greatest of BFE + 3 ft, DFE + 1 ft and 500-year elevation + 1 ft. (FEMA, 2014)
  2. Assess generator fuel autonomy against the class profile: 72 h for F3 and 96 h for F4. (BICSI, 2024)
  3. Check lift and door dimensions against crated, fully populated racks; the Kao Data case uses 2,500 kg lifts as a reference point. (Open Compute Project Foundation, 2022)
  4. Tie the cooling technology choice to the site's water constraint. (U.S. Department of Energy / Federal Register, 2025)

Start with these sources

Related standards and regulations

Calculators and product

Data centre layout in SoSo CAD

Design rack layout, power supplies and cooling zones within the same project.

Racks and infrastructure equipment on a SoSo CAD floor plan

All documents in this topic

1–24 / 342

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.