The Irish Department of Climate, Energy and the Environment guidance page says enterprise, colocation and co-hosting data centres with installed IT demand of at least 500 kW must report prior-year data to the EU database by 15 May each year.

On this page

Overview

The page identifies the obligated data-centre operators in Ireland and explains how prior-year data is reported to the EU database. The scope covers enterprise, colocation and co-hosting centres, and the threshold is installed IT demand of at least 500 kW. Annual reporting is due by 15 May and covers the preceding calendar year.

The guidance distinguishes the directly applicable EU delegated regulation from the domestic transposition of the Energy Efficiency Directive (EED), which was still in progress at publication. This lets an operator see which legal basis the reporting duty rests on and at what stage national legislation stands.

Key points

  1. Scope: enterprise, colocation and co-hosting data centres in Ireland.
  2. Threshold: installed IT demand of at least 500 kW.
  3. Reporting is due by 15 May each year and covers the preceding calendar year.
  4. Data is reported to the EU database.
  5. The directly applicable delegated regulation and the domestic EED transposition process are treated separately.

Using it in design

  • Document the facility's installed IT demand against the 500 kW threshold and settle at design stage whether the obligation applies.
  • For annual reporting, add sub-metering and logging infrastructure that collects energy and sustainability data by calendar year.
  • Place the 15 May reporting date in the operations calendar and assign a data owner.

Who should read it

Engineers designing or operating data centres in Ireland, and compliance officers.

Publication details

Authors
Department of Climate, Energy and the Environment, Ireland
Publisher
Department of Climate, Energy and the Environment, Ireland
Year
2025
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official public publisher text inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.

Citation

Department of Climate, Energy and the Environment, Ireland (2025). Data Centre Energy and Sustainability Performance Reporting Obligations. Department of Climate, Energy and the Environment, Ireland. https://www.gov.ie/en/department-of-climate-energy-and-the-environment/publications/data-centre-energy-and-sustainability-performance-reporting-obligations/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.