Technical guideFree to read2026

Electricity 2026

Original title Electricity 2026 - Analysis and forecast to 2030

International Energy Agency

IEA report of 6 February 2026: global electricity demand grows 3.6% a year on average over 2026-2030, data centres drive about half of US demand growth, and more than 2,500 GW of projects wait in grid queues.

On this page

Overview

The International Energy Agency's (IEA) annual electricity report analyses trends in global electricity systems and markets and gives demand, supply and CO2 forecasts for selected countries, regions and the world. This year the forecast period is extended from three to five years (2026-2030). The CC BY 4.0 licensed report contains special chapters on grids and flexibility and updates on demand response and utility-scale batteries. This summary draws on the executive summary.

On demand, global electricity demand grew 3% in 2025 and 4.4% in 2024 and is expected to grow 3.6% a year on average over 2026-2030, a pace 50% above the previous decade's average. Electricity consumption is projected to grow at least 2.5 times as fast as overall energy demand. Emerging economies account for nearly 80% of additional consumption and China alone for close to 50%. In advanced economies AI, data centres, electric vehicles and advanced manufacturing are re-accelerating growth; US demand grows nearly 2% a year to 2030, with about half the increase from data centres, and EU demand grows about 2% a year.

On supply, renewable generation grows by about 1,000 TWh a year (solar PV alone over 600 TWh), and renewables and nuclear together supply about half of global generation by 2030. Gas generation grows 2.6% a year on average and coal remains the single largest source in 2030. The share of solar and wind rises from 17% to 27%. Emissions from electricity generation were flat in 2025 and are forecast to plateau over 2026-2030.

Grids and flexibility are the special focus: more than 2,500 GW of projects, including large loads such as data centres, are stalled in grid connection queues worldwide. Annual grid investment would need to rise about 50% from today's USD 400 billion to meet demand. Flexible, non-firm connection agreements could enable about 750-900 GW and grid-enhancing technologies about 450-700 GW; together they could free enough capacity to connect 1,200-1,600 GW of advanced-stage projects.

Key points

  1. Global electricity demand grew 3% in 2025 and 4.4% in 2024; it is forecast to grow 3.6% a year on average over 2026-2030 (50% above the previous decade's average).
  2. Electricity consumption grows at least 2.5 times as fast as overall energy demand through 2030.
  3. Emerging economies account for nearly 80% of additional consumption; China about 50%.
  4. US demand grows nearly 2% a year with about half the increase from data centres; EU demand about 2% a year.
  5. Renewable generation grows about 1,000 TWh a year; renewables and nuclear supply about half of global generation by 2030.
  6. The share of solar and wind in global generation rises from 17% to 27% by 2030.
  7. Gas generation grows 2.6% a year on average; coal remains the single largest source in 2030.
  8. More than 2,500 GW of projects, including data centres, are stalled in grid connection queues.
  9. Annual grid investment must rise about 50% from today's USD 400 billion.
  10. Non-firm connections could unlock 750-900 GW and grid-enhancing technologies 450-700 GW, 1,200-1,600 GW in total.
  11. CO2 from electricity generation is about 13,900 Mt a year; flat in 2025 and expected to plateau over 2026-2030.

Using it in design

  • In data-centre connection strategy, evaluate non-firm (flexible) connection agreements as a faster grid access option and define the curtailable share of load in the design.
  • In regions with long grid queues, add on-site generation or storage and phasing options for energy supply to the project schedule.
  • In country-level demand and cost scenarios, use US and EU growth rates (about 2% a year) as a reference and compare your load growth plan against this frame.
  • Reflect grid investment and supply chain pressure as equipment lead-time risk (transformers, switchgear) in the project schedule.
  • Take the effect of demand on the generation mix (gas growth, renewable share) into account in carbon intensity assumptions.

Who should read it

Investors planning data-centre energy and connection strategy, energy analysts and policy specialists.

Document contents

  1. 1. Executive summary
  2. 2. Demand
  3. 3. Supply
  4. 4. Grids
  5. 5. Flexibility

Publication details

Authors
International Energy Agency
Publisher
International Energy Agency
Year
2026
Document language
English
Source type
Government / public
Access
Free to read
Licence
CC BY 4.0: share with attribution
Original licence note

Report page states licence CC BY 4.0. Round 1 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

International Energy Agency (2026). Electricity 2026 - Analysis and forecast to 2030. International Energy Agency. https://www.iea.org/reports/electricity-2026

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.