Technical guideFree to read2026

Data Centres and Flexibility

IEA 4E EDNA · Dierk Bauknecht, Jens Gröger et al.

IEA 4E EDNA platform report (June 2026): data-centre flexibility is assessed through three strategies (workload, supporting infrastructure, additional assets) across four data-centre types; workload shifting has cut peak power by 25-31% for several hours.

On this page

Overview

Prepared for the EDNA platform of the International Energy Agency's 4E Technology Collaboration Programme, the report examines the potential for data centres to provide flexibility to the electricity system. Worldwide data-centre electricity consumption is expected to double between 2025 and 2030, which in some regions requires grid expansion and added generation. The aim is not a single overall flexibility figure but the potential and barriers by data-centre type. The method is a literature review, the authors' expertise and a few stakeholder interviews; the assessment is qualitative.

Flexibility is split into three functions: market-serving (balancing supply and demand), grid-serving (managing grid bottlenecks) and system-serving (real-time stability). Three strategies deliver them: enabling workload flexibility (temporal and spatial shifting, throttling), utilising supporting infrastructure (UPS overcapacity, cooling and temperature set points, generators) and integrating additional assets (batteries, on-site generation, heat use).

Field examples are given: strategies combining temporal rescheduling, resource throttling and temperature adjustment cut demand by up to 31% for several hours, and a start-up achieved a 25% peak power reduction. UPS systems typically cover around 15 minutes, and 80% of survey respondents estimated 10-50% surplus capacity. Changing the cooling set point by 1.1 °C over 12 hours cut facility power by 1.6%, and a 5-7 °C rise is inferred to give a 5-10% reduction.

Usable potential is limited by service level agreements, opportunity costs and investment needs. Results for enterprise, colocation, hyperscale and AI/HPC data centres are summarised in a table. Policy options include a competitive electricity market, dynamic and network tariffs, flexible connection agreements, hourly and regional matching rules and product policy instruments.

Key points

  1. Worldwide data-centre electricity consumption will double between 2025 and 2030.
  2. Three flexibility functions: market-serving, grid-serving, system-serving; three strategies: workload flexibility, supporting infrastructure, additional assets.
  3. Combined temporal shifting, throttling and temperature adjustment reduced demand by up to 31% for several hours; Emerald AI's field experiment achieved a 25% peak demand reduction.
  4. UPS systems cover about 15 minutes on average; 80% of survey respondents estimated 10-50% surplus UPS capacity.
  5. Changing the cooling set point by 1.1 °C cut facility demand by 1.6% over 12 hours; a 5-7 °C rise is inferred to give a temporary 5-10% reduction.
  6. Spatial load shifting (Microsoft example) reduced local grid pressure at a 10% latency increase.
  7. Servers account for about 60% of total power on average and cooling about 20%.
  8. Workload flexibility potential: low for enterprise, low to moderate for colocation (SLA and tenant constrained), moderate to high for hyperscale, low to moderate for AI/HPC.
  9. Additional asset integration shows moderate to high potential across all four data-centre types.
  10. Efficiency and flexibility trade off; consumption sets the theoretical ceiling for flexibility.

Using it in design

  • In new designs, size UPS and battery capacity with usable surplus for flexibility services (for example fast frequency response) and define that use in the SLA risk analysis.
  • In BMS and cooling control, define limits and equipment wear impact so temperature set points can be shifted temporarily.
  • In colocation design, build flexibility authority and curtailment-notice clauses into tenant contracts upfront.
  • Plan on-site batteries and generation as flexibility sources, and decide early which grid function they serve (market, grid, system).
  • Weigh the trade-off between flexibility targets and PUE improvement together in project objectives.

Who should read it

Operators, energy policy specialists and designers planning data-centre flexibility and grid interaction.

Document contents

  1. Summary
  2. 1. Introduction
  3. 2. Available technical potential for data centres to provide flexibility
  4. 3. Challenges and opportunities of data centres to provide flexibility
  5. 4. Overview of main flexibility potentials and policy options
  6. Appendix tables and references

Publication details

Authors
Dierk Bauknecht; Jens Gröger; Christoph Heinemann; Dominik Seebach; Beat Müller
Publisher
IEA 4E EDNA
Year
2026
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official PDF downloaded. Cover June 2026; webpage publication July 2026; February URL directory is not edition date. Printed p.1 states all rights reserved.

Citation

Dierk Bauknecht; Jens Gröger; Christoph Heinemann; Dominik Seebach; Beat Müller (2026). Data Centres and Flexibility. IEA 4E EDNA. https://iea-4e.org/wp-content/uploads/2026/02/EDNA-2026-Data-Centres-and-Flexibility-web.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.