Research paperFree to read2025

Single-Node Power Demand During AI Training: Measurements on an 8-GPU NVIDIA H100 System

IEEE Access (Institute of Electrical and Electronics Engineers (IEEE)) · Imran Latif, Alex C. Newkirk et al.

An IEEE Access 2025 paper measures a maximum of about 8.4 kW on an 8-GPU NVIDIA H100 HGX node, 18% below the manufacturer rating of 10.2 kW.

On this page

Overview

The paper measures the instantaneous power draw of an 8-GPU NVIDIA H100 HGX node while it trains ResNet image classifiers and the Llama2-13b large language model. The aim is to give the models needed to quantify the energy footprint of AI infrastructure a parameter for the power demand of AI hardware during training. The work characterises a single node configuration and provides foundational data for multi-node studies.

The main finding is that the maximum observed power draw was about 8.4 kW, 18% lower than the manufacturer-rated 10.2 kW, even with GPUs near full utilisation. Holding model architecture constant, increasing the ResNet batch size from 512 to 4096 images reduced total training energy consumption by a factor of 4. The results inform capacity planning by data centre operators and energy use estimates by researchers. Future work will examine the impact of cooling technology and carbon-aware scheduling.

Key points

  1. Instantaneous power was measured on an 8-GPU NVIDIA H100 HGX node training ResNet and Llama2-13b.
  2. Maximum observed node power was about 8.4 kW.
  3. This is 18% below the manufacturer rating of 10.2 kW even with GPUs near full utilisation.
  4. Increasing the ResNet batch size from 512 to 4096 cut total training energy by a factor of 4.
  5. The study covers a single node; multi-node and cooling effects are left to future work.

Using it in design

  • For AI racks use the measured power curve rather than nameplate power as the capacity planning input, but set the safety margin by workload variety.
  • Separate the 10.2 kW nameplate value as an upper bound for facility design load from the 8.4 kW measured value as typical heavy training load when sizing rack power distribution.
  • In the energy budget reflect in operating scenarios that software settings such as batch size change total training energy.
  • Do not multiply a single-node measurement directly to a multi-node cluster; assess network, cooling and coordination effects separately.

Who should read it

Data-centre operators and researchers planning power and energy capacity for AI training clusters.

Publication details

Authors
Imran Latif; Alex C. Newkirk; Matthew R. Carbone; Arslan Munir; Yuewei Lin; Jonathan Koomey; Xi Yu; Zhihua Dong
Publisher
IEEE Access (Institute of Electrical and Electronics Engineers (IEEE))
Year
2025
Document language
English
Source type
Scientific
Access
Free to read
Licence
CC BY-NC-ND 4.0: share unaltered with attribution for noncommercial purposes
Original licence note

Publisher-deposited Crossref licence metadata: https://creativecommons.org/licenses/by-nc-nd/4.0/ (OpenAlex: cc-by-nc-nd); landing page blocks automated fetch, abstract read via Crossref/OpenAlex. Non-commercial licence: link/cite only in a commercial product.

Citation

Imran Latif; Alex C. Newkirk; Matthew R. Carbone; Arslan Munir; Yuewei Lin; Jonathan Koomey; Xi Yu; Zhihua Dong (2025). Single-Node Power Demand During AI Training: Measurements on an 8-GPU NVIDIA H100 System. IEEE Access (Institute of Electrical and Electronics Engineers (IEEE)). https://doi.org/10.1109/access.2025.3554728

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.