Technical guideFree to readYear not stated

Everest Triera EVO 10-200 kVA: Installation and Operation Manual

Original title Everest Triera EVO 10–200 kVA: Kurulum ve Kullanım Kılavuzu

İnform Elektronik

Inform Elektronik's Everest Triera EVO manual for 10-200 kVA three-phase UPS covers placement (50 cm front and rear), a protection and cable table, operating modes and maintenance; efficiency is 96% or more.

On this page

Overview

Inform Elektronik's Everest Triera EVO manual covers an 11-model family (ETR EVO 33010 to 33200) of 10-200 kVA UPS with three-phase input and output, across warranty, safety, transport, placement, storage, electrical requirements, installation, operating modes, front panel, commissioning, maintenance and troubleshooting. The unit is designed to EN 62040-1 and EN 62040-2, and the manual states a ministry-defined service life of 10 years.

The placement section gives equipment-specific rules: operation is possible at 0 to +40 C ambient, but where batteries are inside the unit or an external battery cabinet is used, 20-25 C is recommended for best performance and life. Ventilation outlets are at the front and rear; 50 cm of clear space is required at the front and 50 cm at the rear for maintenance and ventilation, and at least 50 cm between the front and a wall. The room must be dry and free of dust, with no conductive or corrosive dust. Storage is -25 to +55 C, or -15 to +40 C with internal batteries, and battery charging after long storage must last at least 10 hours.

The electrical requirements table gives input, bypass, output and battery cables, input, bypass and battery fast fuses, and residual current protection by rating. For example 10 kVA has a 20 A fuse and 3x6 mm2 cable, 100 kVA has 175 A and 3x50 mm2, and 200 kVA has 320 A and 3x120 mm2; residual current protection is 300 mA on all models. With non-linear loads the neutral conductor can be loaded at 1.5-2 times and must be sized accordingly; the output neutral must never be connected to protective earth.

Operating modes are bypass, inverter, battery, off and manual bypass, and the mode priority can be set to online or eco. According to Appendix 3 output power factor is 1.0 (kVA = kW), total efficiency is 96% or more (over 98.5% in bypass mode), input power factor is 0.99 or more, input voltage tolerance is 187-265 V at 100% load and 120-265 V at 50% load (phase-neutral), overload is 600 s at 100-125% and 60 s at 125-150%, and transfer time is 0. In maintenance the manual leaves battery, battery fuse, fan and capacitor checks to authorised service.

Key points

  1. 11 models from 10 to 200 kVA (10, 15, 20, 30, 40, 60, 80, 100, 120, 160, 200 kVA); output power factor 1.0 (kVA = kW).
  2. Placement: 50 cm at the front and 50 cm at the rear; at least 50 cm between front and wall; operation 0-40 C; 20-25 C recommended for batteries.
  3. Total efficiency is 96% or more (over 98.5% in bypass mode); input power factor 0.99 or more; THDV under 2% linear and under 4% non-linear.
  4. Input voltage tolerance is 187-265 V at 100% load and 120-265 V at 50% load (phase-neutral); frequency 45-65 Hz.
  5. Overload: 600 s at 100-125% and 60 s at 125-150%; transfer time 0; crest factor 3:1; static regulation +/-1%.
  6. Protection table examples: 10 kVA 20 A and 3x6 mm2; 100 kVA 175 A and 3x50 mm2; 200 kVA 320 A and 3x120 mm2; residual current protection 300 mA.
  7. With non-linear loads the neutral may be loaded at 1.5-2 times in normal operation; the output neutral is not connected to protective earth.
  8. Storage -25 to +55 C (units with internal batteries -15 to +40 C); charge for at least 10 hours after long storage.
  9. Environment: humidity 20-95% non-condensing, altitude 1000 m, noise under 60 dBA (1 m); communication RS232, RS485 Modbus and optional SNMP.

Using it in design

  • In the electrical-room layout leave 50 cm of service and ventilation space at the front and rear, and keep at least 50 cm between the front and a wall.
  • Select input, bypass and battery protection from the manual's table and check cable sizes against it; do not earth the output neutral.
  • For data halls with non-linear loads, size the neutral conductor for 1.5-2 times the load current.
  • Design battery room temperature in the 20-25 C range; account in the cooling decision for the fact that running at the 0-40 C limit shortens battery life.
  • When choosing eco mode, assess the protection level of the bypass line; prefer online priority for critical loads.

Who should read it

Electrical engineers, commissioning and maintenance teams installing Everest Triera EVO UPS in Turkey.

Document contents

  1. Warranty
  2. Safety
  3. Rules to follow (transport, placement, storage, electrical requirements)
  4. Unpacking and installation
  5. Operating modes
  6. Front panel
  7. Operating procedures
  8. Maintenance
  9. Troubleshooting
  10. Appendix 1 Alarm list
  11. Appendix 2 Event log list
  12. Appendix 3 Technical specifications
  13. Appendix 4 UPS description and block diagram

Publication details

Authors
İnform Elektronik
Publisher
İnform Elektronik
Year
Year not stated
Document number
288717230 / INF511-Y01-U744-1-01
Document language
Turkish
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Üreticinin herkese açık kaynağı okundu. Açık erişim yeniden dağıtım izni değildir; tam metin kütüphaneye alınmaz. Basılı s. ii / PDF s. 2 çoğaltma ve yayımlama için yazılı izin ister. Yayın yılı belirtilmemiş. Bölüm 3.2 ile teknik tabloda nem aralıkları farklı olduğundan nem sınırı aktarılmadı.

Citation

İnform Elektronik Everest Triera EVO 10–200 kVA: Kurulum ve Kullanım Kılavuzu. İnform Elektronik. 288717230 / INF511-Y01-U744-1-01. https://www.inform.com.tr/dosya/pdf/etr-evo.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.