Technical guideFree to read2017

Decision Points on Chillers for Data Centers: Should you choose an air- or water-cooled system?

Johnson Controls (YORK), reprinted from Mission Critical · Fred Berry, Christian Rudio et al.

Johnson Controls (YORK) chiller engineers' Mission Critical article (April 2017) compares water-cooled centrifugal chillers with towers against air-cooled screw/scroll chillers on CAPEX, energy, water, footprint, noise and peak demand.

On this page

Overview

The article is a decision guide by Johnson Controls chiller engineers, published in Mission Critical magazine and reprinted by YORK (2017). It compares the water-cooled centrifugal chiller and cooling tower option with air-cooled screw or scroll chillers on capital cost, energy, water and sewage, footprint, maintenance, noise and peak-demand behaviour, in the context of rising allowable temperatures.

Once tower, piping and pumps are added, first cost per ton is similar in the two options. The footprint difference is marked: a 500-ton air-cooled chiller is about 52 ft long and a water-cooled chiller of the same capacity about 14 ft. Water-cooled centrifugal chillers can handle capacities well above 500 tons.

Variable-speed drives with soft start reduce inrush current and demand charges and allow chillers to restart simultaneously. The article is written by manufacturer engineers and its water, energy and cost comparisons are general trends that must be calculated separately for a given site.

Key points

  1. Once tower, piping and pumps are added, first cost per ton is similar for both options.
  2. A 500-ton air-cooled chiller is about 52 ft long versus about 14 ft for a water-cooled chiller.
  3. Water-cooled centrifugal chillers handle capacities well above 500 tons.
  4. Variable-speed drives with soft start reduce inrush and demand charges and allow simultaneous chiller restart.
  5. The comparison covers energy, water and sewage, footprint, maintenance, noise and peak demand.

Using it in design

  • In chiller-type selection, add tower, piping and pump costs to the first-cost comparison.
  • On space-constrained sites, assess the footprint difference between air-cooled and water-cooled chillers (52 ft versus 14 ft) in the layout plan.
  • Make water availability, water and sewage cost and noise limits criteria for type selection.
  • Write variable-speed drives and soft start into the specification for simultaneous restart after an outage and for peak demand.

Who should read it

Mechanical engineers selecting the chiller type for a data-centre cooling plant and project decision makers.

Related standards

  • ASHRAE 90.1-2013
  • ASHRAE TC 9.9 thermal guidelines

Publication details

Authors
Fred Berry; Christian Rudio; Dave Ritter
Publisher
Johnson Controls (YORK), reprinted from Mission Critical
Year
2017
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Magazine reprint hosted by YORK; no open licence stated

Citation

Fred Berry; Christian Rudio; Dave Ritter (2017). Decision Points on Chillers for Data Centers: Should you choose an air- or water-cooled system?. Johnson Controls (YORK), reprinted from Mission Critical. https://www.york.com/-/media/Project/JCI-Global/York-Sites/United-States-York/Insights/Files/MC_Reprint_April2017.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cooling capacity in SoSo CAD

Check zone heat loads, installed capacity and the capacity left with the largest unit out, as part of the design.

Zone heat loads and capacity balance in the SoSo CAD cooling workspace