Optimal Operation of Gas Turbine Generator and Energy Storage for Islanded Microgrid AI Data Centers Under Workload Dynamics
Inventions (MDPI) · Hyeonseong Mun, Damjan Zechevikj et al.
A 2026 Inventions (MDPI) paper finding that, for a 12 MW AI data-centre power block, the optimal gas turbine generator operating point is about 40-73.3% of the initially selected rating when paired with long-duration storage.
On this page
Overview
The paper states that the highly variable, mission-critical load profiles of AI data centres challenge conventional supply strategies, and proposes an islanded microgrid hybrid of a gas turbine generator (GTG) and long-duration energy storage (LDES) that provides short-term load balancing and extended support in a prolonged outage.
A probabilistic multi-phase workload model captures the temporal character of training, fine-tuning and inference, including high-frequency fluctuation and multi-day workload variation. The workload is a generator representing these phases rather than a reproduction of a measured dataset, and the model assumes the storage power-electronics interface can compensate rapid load transients.
Based on reliability requirements, an LDES sizing method sets capacity for a 12 MW power-block system using a 12-hour autonomy criterion. The GTG operating point is evaluated with four storage metrics: charge/discharge transition frequency, charging-time ratio, state-of-charge (SoC) deviation and cumulative energy movement.
Key points
- Architecture: islanded microgrid hybrid of a gas turbine generator (GTG) and long-duration energy storage (LDES).
- Scale: 12 MW power-block AI data centre; storage capacity set by a 12-hour autonomy criterion.
- The optimal GTG operating point is about 40-73.3% of the initially selected rating and closely tracks the time-varying average load.
- Fixed-output GTG operation can cause SoC drift under sustained workload variation; the identified optimal point keeps SoC in range.
- Evaluation metrics: charge/discharge transition frequency, charging-time ratio, SoC deviation, cumulative energy movement.
- The workload model is a generator of training, fine-tuning and inference phases, not a measured dataset.
Using it in design
- For off-grid AI data centres, choose GTG rating by an operating-point range that tracks average load, not by peak load alone.
- Size storage on a long autonomy criterion (for example 12 hours) and write SoC deviation criteria into operating conditions.
- Verify in product selection and testing that the storage power electronics can handle rapid load transients, since the model assumes it.
- The results are a simulation framework; revalidate with measured workload profiles from the actual facility.
Who should read it
Electrical and energy engineers designing islanded or off-grid AI data-centre power systems.
Publication details
- Authors
- Hyeonseong Mun; Damjan Zechevikj; Surya Santoso; Lei Jiang
- Publisher
- Inventions (MDPI)
- Year
- 2026
- Document number
- 11(4), 81
- Document language
- English
- Source type
- Scientific
- Access
- Free to read
- Licence
- CC BY 4.0: share with attribution
Original licence note
The article-specific publisher footer links CC BY 4.0; full HTML inspected, PDF download returned 403. Third-party credit lines remain applicable. General dc.rights metadata may show BY 3.0; the article-specific footer controls this record.
Citation
Hyeonseong Mun; Damjan Zechevikj; Surya Santoso; Lei Jiang (2026). Optimal Operation of Gas Turbine Generator and Energy Storage for Islanded Microgrid AI Data Centers Under Workload Dynamics. Inventions (MDPI). 11(4), 81. https://doi.org/10.3390/inventions11040081