Nordic Energy Research report of June 2026 (NER2026-02): maps energy security cooperation across eight Nordic jurisdictions and gives a roadmap of 25 recommendations for the short term (0-3 years) and medium term (3-10 years).

On this page

Overview

The report starts from the view that, in a time of geopolitical uncertainty, threats of sabotage and a more vulnerable European energy system, the old forms of Nordic energy cooperation may not be sufficient. The shared power system rests on renewable and fossil-free sources flowing freely across borders and forms the foundation of the region's competitiveness. The report maps the state of energy security cooperation across eight Nordic jurisdictions: Denmark, Finland, Iceland, Norway, Sweden, the Faroe Islands, Greenland and Åland.

It assesses the region's energy systems, the existing cooperation architecture, the regional threat picture in the Baltic and Arctic regions and the carrier-specific vulnerabilities in electricity, oil and natural gas. It concludes with a roadmap of 25 recommendations for strengthening Nordic cooperation over the short term (0-3 years) and medium term (3-10 years), with country-specific recommendations for each of the eight jurisdictions. It is relevant to the external dependencies of Nordic data-centre sites.

Key points

  1. The report is dated June 2026 (NER2026-02) and covers eight Nordic jurisdictions: Denmark, Finland, Iceland, Norway, Sweden, the Faroe Islands, Greenland and Åland.
  2. The shared Nordic power system rests on renewable and fossil-free sources flowing freely across borders.
  3. The report assesses energy systems, the cooperation architecture and the Baltic and Arctic threat picture.
  4. Carrier-specific vulnerabilities are treated for electricity, oil and natural gas.
  5. The roadmap has 25 recommendations for the short (0-3 years) and medium (3-10 years) term, with additional recommendations for each jurisdiction.
  6. The roadmap addresses electricity infrastructure security and regional operational coordination.

Using it in design

  • For data-centre sites in the Nordics, extract external dependencies (cross-border electricity flows, fuel supply) as inputs to the reliability analysis.
  • Assess backup generator fuel stock and supply continuity in light of the report's oil and natural gas vulnerabilities.
  • Include sabotage and geopolitical risk scenarios in the critical infrastructure risk assessment and consider energy supply diversity in the design.
  • Use the country-specific recommendations to track the regulatory and cooperation framework of the jurisdiction where the project sits.

Who should read it

Investors, risk managers and policy specialists planning data-centre sites and energy supply security in the Nordic countries.

Publication details

Authors
Nordic Energy Research; Economic Security Forum
Publisher
Nordic Energy Research
Year
2026
Document number
NER2026-02
Document language
English
Source type
Industry body
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Publisher landing, chapter 8 and https://pub.norden.org/nordicenergyresearch2026-02/about-this-publication.html opened. About page says copyright Nordic Energy Research 2026 and separately credits cover photo iStock; no explicit open licence found. No unrestricted redistribution inferred.

Citation

Nordic Energy Research; Economic Security Forum (2026). Energy Security in the Nordics. Nordic Energy Research. NER2026-02. https://doi.org/10.6027/NER2026-02

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.