Technical guideFree to read2026

Open Rack V3 +/- 400V to 50V 18kW PSU Design Specification, Version 1.0.0

Open Compute Project Foundation (Meta Platforms contribution) · Sanket Sapre, Dmitriy Shapiro et al.

Meta's specification (initial OCP release 20 February 2026) for an 18 kW power supply that converts a +/-400 VDC (800 V) distribution bus to the 50 V ORv3 rack busbar, as part of the shift to high-voltage DC power for AI racks. It is a reference for designers evaluating 800 VDC facility distribution and sidecar power racks.

On this page

Overview

The specification defines the HVDC-input power supply that fits the 49 V power shelf. Output is 50 V nominal with an adjustable range; the document calls this a narrow-range 48 V architecture and lists its benefits against ORv2's 40-60 V range: keeping the range as narrow as possible to avoid oversized voltage and current design, enabling 4:1 fixed-ratio converters and conventional downstream 12 V PoL converters, letting power flow naturally without software control and dependency, and allowing a simple fixed-voltage power-supply design.

In summary the input is: 18 kW output power; nominal input +/-400 VDC to +/-410 VDC, +/-5%; continuous operation from +/-380 V to +/-420 V. If the input leaves this range the PSU operates its relay within 6 ms. Efficiency is measured at +/-400 V input with fans connected, at 25 degC ambient after 30 minutes at full load: peak efficiency 98.5% and full-load efficiency 97.5%. Output voltage is 50 V at no load and 49 V at full load (1 V default droop, 48.5 V at 150% load); ripple is at most 500 mV peak to peak. Minimum hold-up time is 6 ms at full load.

Protection and behaviour requirements include: shutdown if input exceeds 450 V for 20 ms; cold-start inrush current of at most 30 A; re-rush current after dropout below 150% of steady-state current for under 2 ms; output overvoltage shutdown above 52.5 V (within 200 ms) with fast OVP so that 54 V is never exceeded; and over-power protection if average power exceeds 115% for 10 s or 120% for 100 ms. Input fuses must be UL approved for an interrupt rating of at least 20 kA and coordinated with the HPRv4 DC PDU fuse curve. Output return is not connected to earth, and no Y-caps sit between 50 V and chassis outside the ORing FET.

The document also defines a pulse-power requirement for GPU loads: repetitive peaks must be carried while keeping output regulation and the input power limit (140% at 50 ms moving average, 160% at 400 us moving average, 100% at 1 s or longer average) without triggering the BBU, and the input current waveform must not be clamped.

A DC_Loss_L signal is reserved (for reference, not required): the PSU asserts it after a 4-5 ms validation delay on DC loss and releases it at least 500 ms after recovery. Communication is Modbus (up to 115 kbps). The operating environment is -5 to +45 degC inlet temperature, 10-90% relative humidity and 0-3050 m altitude; the target MTBF is 500K hours (Telcordia SR-332, 45 degC, 400 VDC, full load), with a demonstrated MTBF of at least 500K hours at 90% confidence before first shipment.

Key points

  1. Output is 18 kW at a nominal 50 V; nominal input +/-400 VDC (up to +/-410 VDC) +/-5%, continuous operation from +/-380 V to +/-420 V.
  2. Peak efficiency above 98.5% and full-load efficiency above 97.5%, measured with fans and 25 degC inlet air.
  3. Output voltage is 50 V at no load and 49 V at full load (1 V droop); minimum hold-up time is 6 ms at full load.
  4. Input overvoltage protection: shutdown if input is above 450 V for 20 ms; if input leaves the range the PSU operates its relay within 6 ms.
  5. Cold-start inrush current is at most 30 A; re-rush current after dropout is below 150% of steady-state current for under 2 ms.
  6. Pulse-load requirement: repetitive peaks of 140% (50 ms moving average) and 160% (400 us) without triggering the BBU while holding regulation.
  7. The narrow-range 48 V architecture (50 V nominal), rather than ORv2's 40-60 V range, allows fixed-ratio 4:1 converters.
  8. Input fuses need a UL-approved interrupt rating of at least 20 kA and must be coordinated with the HPRv4 DC PDU fuse curve.
  9. Operating environment: inlet air -5 to +45 degC, relative humidity 10-90%, altitude 0-3050 m; target MTBF 500K hours.
  10. All PSU modules in one rack must come from the same supplier; modules and shelves from different suppliers must be interoperable and interchangeable.

Using it in design

  • When considering 800 VDC (+/-400 VDC) distribution, compare the power shelf input against the +/-380 to +/-420 V continuous range and the 450 V overvoltage threshold with the facility distribution voltage tolerance.
  • In loss and PUE calculations, enter PSU efficiency as 97.5% at full load and 98.5% at peak; note that losses are measured with fans and 25 degC inlet air.
  • For upstream protection coordination, assess the PSU input fuse together with the HPRv4 DC PDU fuse curve and DC distribution short-circuit levels; carry the UL interrupt rating of at least 20 kA into the specification.
  • For GPU pulse loads, verify that the PSU carries the 140% (50 ms) and 160% (400 us) peaks without triggering the BBU, and account for this pulse behaviour in upstream power supply and generator sizing.
  • Write grounding and insulation-monitoring decisions to the specification's basis: output return is not earthed and no Y-caps sit between 50 V and chassis outside the ORing FET; choose the facility earthing scheme to be consistent.
  • Treat rack cooling on the basis of -5 to +45 degC inlet air and front-to-back airflow; carry the target MTBF (500K hours) and the PSU redundancy plan (N+1) into the maintenance strategy.

Who should read it

Electrical designers evaluating 800 VDC facility distribution and sidecar power racks, rack and power-shelf designers, and PSU manufacturers.

Document contents

  1. Scope (glossary of acronyms)
  2. Overview (narrow-range 48V architecture)
  3. Electrical Requirements (DC input voltage, start-up, input overvoltage and overcurrent protection, inrush, efficiency, output voltage, droop, ripple, dynamic response, hold-up time, DC_Loss_L signal, pulse power, output protections, current sharing, grounding, Y-cap, power system stability, connector pinout, interoperability)
  4. Communication (Modbus, firmware upgrade, metering accuracy, blackbox function)
  5. Environmental requirements (temperature, humidity, altitude, acoustic noise, vibration and shock)
  6. Thermal requirements
  7. Mechanical requirements
  8. Reliability (component derating, MTBF, DFMEA, HALT, disallowed components)
  9. Manufacturing and quality
  10. Compliance (safety, EMC, environmental, documentation)

Related standards

  • OCP ORv3 HVDC-LVDC 100kW Power Shelf
  • OCP Diablo 400
  • OCP Mt. Diablo Disaggregated Power Rack

Publication details

Authors
Sanket Sapre; Dmitriy Shapiro; Zuhir Sras; John Fernandes; Ben Kim; Baby Neil Escuadro; Siu Lam; Mingchun Xu
Publisher
Open Compute Project Foundation (Meta Platforms contribution)
Year
2026
Document number
Version 1.0.0
Document language
English
Source type
Industry body
Access
Free to read
Licence
OWFa 0.9: Open Compute open specification licence; redistribution permitted
Original licence note

License section: contributions under OCP CLA by Meta; usage governed by Modified OWFa 0.9 FSA (as of 16 Oct 2024). Round 1 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

Sanket Sapre; Dmitriy Shapiro; Zuhir Sras; John Fernandes; Ben Kim; Baby Neil Escuadro; Siu Lam; Mingchun Xu (2026). Open Rack V3 +/- 400V to 50V 18kW PSU Design Specification, Version 1.0.0. Open Compute Project Foundation (Meta Platforms contribution). Version 1.0.0. https://www.opencompute.org/documents/hvdc-lvdc-psu-18kw-spec-1-0-0-pdf/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.