MEDCOM STS EN 01/2005, pp.13,16–17
MEDCOM
An 18-page engineering catalogue from Polish manufacturer MEDCOM, dated 2005, for the SS, SSN, SST and SSTN static transfer switch series from 25 A to 630 A: automatic transfer between synchronised sources takes less than 6 ms and manual transfer less than 0.2 ms, and the model tables give losses, enclosure size and weight for every type.
On this page
Overview
The catalogue describes thyristor-based static transfer switches (STS) that move a load between two independent single-phase or three-phase AC sources. Four series are distinguished by pole count: SS is single-phase 1 pole, SSN single-phase 2 pole, SST three-phase 3 pole and SSTN three-phase 4 pole. According to the document an STS transfers about 20 times faster than a conventional automatic transfer switch, typically within a quarter cycle. Applications named include power and petrochemical plants, computer and telecommunication centres, operating theatres and intensive care units.
The operating logic is given in detail. A transfer is triggered by a disturbance on the preferred source voltage, an overcurrent in the source, or a manual or remote change of preferred source. Transfer is not allowed when the alternate source voltage is incorrect or the output current is excessive; this overcurrent interlock keeps a faulty load from carrying the disturbance over to the second source. If the sources are not synchronised the transfer is delayed: 11, 15, 23 or 48 ms is set by DIP switch, giving 13, 17, 25 or 50 ms in total with the 2 ms detection time. Internal mechanical bypass switches allow servicing without interrupting the load.
After transfer examples backed by oscillograms, the catalogue shows five configurations as single-line diagrams: one STS ahead of a power distribution unit (PDU), two STS units for a two-section PDU with a tiebreaker, a bypass arrangement for inverters with limited output current, local STS units close to the loads in a dual AC power system, and a redundant UPS supply system. The last arrangement requires the two UPS systems to be synchronised; each STS is sized to carry the combined load of both PDU sections, and the single point of failure is removed.
The specifications cover nominal voltages of 120 V, 230 V, 3 x 208 V, 3 x 400 V and 3 x 480 V, a voltage range of -25% to +20% and efficiency above 98% to 99%. The model tables give rated current, losses, enclosure type, dimensions and weight on a separate row for each type: the SST400AC25, for example, is 3 x 400 V, 50 Hz, 3 x 25 A, 130 W losses, 1100 x 800 x 400 mm and 93 kg. In the SSTN series the neutral line is rated for twice the phase current. The catalogue dates from 2005, and the current product range is taken from the manufacturer's newer documents.
Key points
- Series: SS (single-phase, 1 pole), SSN (single-phase, 2 pole), SST (three-phase, 3 pole), SSTN (three-phase, 4 pole); rated currents 25, 40, 63, 100, 150, 250, 400 and 630 A.
- With synchronised lines, manual transfer takes less than 0.2 ms and automatic transfer less than 6 ms; without synchronisation the total transfer time is 13, 17, 25 or 50 ms.
- Overload capacity: 125% for 1 hour, 400% for 5 s, 800% for 0.4 s, 1000% for 0.2 s, 1500% for 20 ms.
- Thyristor short-circuit strength (20 ms): 3 kA for 25 to 63 A, 8 kA for 100 and 150 A, 15 kA for 250 and 400 A, 28 kA for 630 A; fuse interrupting capacity 50 kA.
- The output overcurrent interlock is set by DIP switch to 3 In, 6 In, 9 In or no interlock.
- Voltage thresholds: upper limit +6% to +20% in 3% steps, lower limit -8% to -24% in 4% steps; phase error limit for synchronised lines ±8° to ±24°.
- SST400AC25: 3 x 400 V, 50 Hz, 3 x 25 A, 130 W losses, 1100 x 800 x 400 mm, 93 kg. SST400AC400: 1600 W losses, 1900 x 1200 x 500 mm, 315 kg.
- Rack-mount single-phase models are 3U high (133.5 x 483 x 415 mm); the SS230AC63-RM weighs 12.5 kg and dissipates 120 W.
- On SST and SSTN switches the neutral line capacity is 200% of the phase line capacity.
Using it in design
- When selecting an STS, add the tabulated losses (1600 W for the 400 A three-phase model, for example) to the electrical room heat load.
- In dual-fed designs with STS units close to the load, set the overcurrent interlock threshold (3, 6 or 9 In) so that a faulted load is not transferred to the healthy source.
- When building redundancy between two UPS systems with STS units, require synchronisation of the UPS outputs, and compare the 13 to 50 ms interruption of an unsynchronised transfer with the load's hold-up time.
- In the two-STS PDU arrangement with a tiebreaker, size each STS for the combined load of both sections.
- For in-rack use, include in the layout the rack space taken by the 3U rack-mount models and the separate maintenance bypass modules (MB series).
Who should read it
Electrical engineers designing dual-fed critical load distribution, STS specifiers, and operations teams assessing existing MEDCOM installations.
Document contents
- Application
- Standard features
- Standards applied
- Block diagrams
- Schematic diagrams
- Principle of operation
- Control panel
- Installation
- Oscillograms
- Configurations
- Specifications
- Static transfer switches series: model tables
Publication details
- Authors
- MEDCOM
- Publisher
- MEDCOM
- Year
- 2005
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
No document-specific redistribution permission was established. Bibliographic reference only.
Citation
MEDCOM (2005). MEDCOM STS EN 01/2005, pp.13,16–17. MEDCOM. https://fibat.ro/medcom/static_transfer_switch.pdf