Parus Electro's June 2025 manual for the SIPB RT 1-3 kVA UPS: power factor 1.0, 95% efficiency in ECO mode, 0 ms battery transfer, overload times from 105% to 130%, and detailed status and fault codes.

On this page

Overview

The manual is the user document for the 1 to 3 kVA floor/rack (RT) SIPB double-conversion UPS series. It explains that the UPS protects sensitive electronic equipment against outages, voltage swings, surges, momentary voltage loss, noise, frequency deviation, switching transients and non-linear distortion. The document covers safety rules, installation and setup, operation, troubleshooting, maintenance, options and technical specifications.

The installation and operation sections explain transport, installation preparation, switching the UPS on and off, battery setup, and the LCD panel and control buttons. Operating states (standby, no output, bypass, mains, battery, battery test, inverter start, ECO, emergency off, service bypass, alarm) and numbered fault codes (rectifier, fan, overcurrent, overload, no battery, bypass unavailable, inverter fault, EPO contact) are given as tables. The options section covers the internal SNMP card and dry-contact outputs.

The specifications cover four models (1000, 1500, 2000 and 3000 VA/W): output power factor 1.0, voltage accuracy +/-1%, output THDv at most 3% on linear load and 5% on non-linear load, efficiency on mains of 90%, 90%, 91% and 92%, on battery 85-86%, and 95% in ECO mode. It is a product user manual giving installation and operation information; it holds no selection or comparison for design decisions.

Key points

  1. Ratings: 1000 VA/1000 W, 1500 VA/1500 W, 2000 VA/2000 W, 3000 VA/3000 W; output power factor 1.0 and voltage accuracy +/-1%.
  2. Output THDv at most 3% on linear load and 5% on non-linear load; crest factor 3:1; pure sine output waveform.
  3. Efficiency: on mains 90%/90%/91%/92%, on battery 85%/85%/86%/86%, ECO mode 95%.
  4. Transfer time: mains to battery 0 ms; inverter to bypass typically 4 ms.
  5. Overload (mains mode): 1 minute at 105-125%, 30 seconds at 125-130%, bypass in 0.2 s above 130%; on battery 1 minute at 105-125%, 10 seconds at 125-130%, shutdown in 0.2 s above 130%; in bypass mode shutdown after 5 minutes above 200%.
  6. Batteries: 12 V/9 Ah, 3, 4, 6, 6 units by model; charge voltage 41.0, 54.7, 82.1, 82.1 V DC; charge current 1 A; typical 4 hours to 90% charge.
  7. Dimensions 440 x 460 x 86.5 mm (1-1.5 kVA) and 440 x 600 x 86.5 mm (2-3 kVA); net weight 15.9, 19.8, 26.9 and 27.2 kg.
  8. Operating humidity 20-90% at 0-40 degrees C; storage temperature -25 to 55 degrees C; in storage at -25 to 40 degrees C charge at least 1-2 hours every 3 months.
  9. Communication USB and/or RS232; internal slot for an SNMP mini card or dry contacts; 2 x RJ45 Ethernet line protection.

Using it in design

  • For a small IT room or network cabinet, treat the active power (W) of a power-factor-1.0 rack UPS as equal to kVA in load calculation and put the overload times (1 minute at 105-125%) into the specification.
  • Calculate battery autonomy from the number of 12 V/9 Ah blocks and external battery packs; add the 3-monthly charge rule for stored units to the operating procedure.
  • If the 95% ECO mode efficiency will be used, compare the typical 4 ms inverter-to-bypass transfer with the load's tolerance.
  • For in-rack installation check the 86.5 mm height (2U) and 440 x 600 mm depth, with weight, against rack load capacity.
  • Connect the internal SNMP card or dry-contact outputs to the building monitoring system; add the EPO contact logic to the safety diagram.

Who should read it

Electrical designers, field technicians and operations staff installing and running rack-type UPS for small IT rooms and network infrastructure.

Document contents

  1. Safety
  2. Installation and setup
  3. Operation
  4. Troubleshooting
  5. Storage and maintenance
  6. Additional options
  7. Specification

Publication details

Authors
Parus Electro
Publisher
Parus Electro
Year
Year not stated
Document language
Russian
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Parus Electro СИПБ 1–3 kVA PF1 manual, v2.79 June 2025, pp.1,35–37. Parus Electro. https://sipower.com/upload/iblock/57b/5wqo7vcj5ffp3sb9hlfn6xoh57o1841p/sipb_1_3k_pf1_0_ver2_7_manual.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.