DSPM Power Lynx 3 three-phase online UPS technical specifications
DSPM
A 10-page guide specification, number 084-0036-01, in which DSPM sets out the tender requirements for its Power Lynx 3 three-phase, online, double-conversion UPS in three parts: operation at 0-40 °C, 10 minutes of battery autonomy at full load and 25 °C, inverter overload of 125% for 1 minute and UL 924 listing.
On this page
Overview
The document follows the three-part specification layout used in North American tendering: General, Products and Execution. It is written so that a designer can carry it straight into a project specification; the output power and the input and output voltage fields are left blank and the reader is referred to the product datasheet for power ranges. The system consists of a solid-state inverter, a temperature-compensated rectifier and battery charger, a static switch rated 100% for continuous duty, an internal maintenance bypass switch, a battery plant and a control panel. Lighting loads and other critical loads are the target.
The general part lists the standards: IEEE 587-1980/ANSI C62.41 for surge withstand, FCC Part 15 Subpart J Class A, UL 924, NEMA PE 1, NEMA 250 and NFPA 70. The manufacturer must show at least twenty years of documented experience, run a factory test that includes a battery discharge test before shipment and supply the test report on request. Environmental conditions are 0-40 °C operating, -20 to +60 °C non-operating, 5-95% non-condensing humidity and 1000 m altitude; operation up to 2000 m is allowed where ambient temperature stays below 28 °C.
The products part fixes electrical performance in numbers. Input voltage tolerance is -15% / +10%, frequency is 60 Hz and power walk-in ramps from 0 to 100% over 10 seconds. Output voltage regulation is ±3%, voltage distortion is at most 5% on a 100% linear load and below 8% on a 100% non-linear load. Voltage deviation on a load step is ±5% for a 50% step and ±8% for a 100% step, and voltage returns to within 3% of nominal in 50 ms.
Operating modes are defined as normal, emergency (battery), recharge, static bypass and manual bypass. The battery is valve-regulated sealed lead calcium (VRLA); float voltage is 2.3 VDC per cell and temperature compensation is -3 mV per cell per °C referenced to 25 °C. Deep-discharge protection, a battery circuit check and a selectable partial discharge test are required. The execution part calls for on-site start-up by the manufacturer's field service engineer and for user training. The specification is written around one product; substitutions need written approval at least 10 days before bid closing.
Key points
- Scope: three-phase, online, double-conversion UPS; the static switch is rated 100% for continuous duty.
- Environment: operating 0-40 °C, non-operating -20 to +60 °C, batteries at 25 °C; humidity 5-95% non-condensing; 1000 m altitude, 2000 m below 28 °C.
- Audible noise is 45 dBA at 3 feet.
- Input: -15% / +10% voltage tolerance, 60 Hz, 0-100% power walk-in over 10 seconds, magnetising inrush below nominal current for less than one cycle.
- Output: ±3% regulation, THD at most 5% on linear load and below 8% on non-linear load, frequency 60 Hz ±0.1 Hz when free running.
- Dynamic response: ±5% on a 50% load step, ±8% on a 100% step; recovery to the 3% band within 50 ms.
- Overload: inverter 125% for 1 minute and 145% for 10 seconds; bypass above 150% for 30 seconds and above 200% for one cycle.
- Battery: VRLA lead calcium, 10 minutes at full load at 25 °C, float 2.3 VDC/cell, compensation -3 mV/cell/°C.
- Equipment containing batteries is not stored for more than three months without being powered for 8 hours to recharge them.
- Warranty: 12 months from installation or 18 months from shipment, whichever comes first; batteries 1 year full replacement plus 9 years pro-rated.
Using it in design
- When writing your own UPS specification, use the part structure (General, Products, Execution) and the numeric acceptance criteria (regulation, THD, step response, overload) as a checklist.
- In the selectivity and fault-clearing study, compare the bypass withstand (above 150% for 30 seconds, above 200% for one cycle) with the trip curves of downstream breakers.
- For generator sizing, include the 10-second power walk-in and the low magnetising inrush in the step-load calculation.
- Design cooling that holds the battery room at 25 °C, and confirm the -3 mV/cell/°C compensation coefficient in the charger settings.
- For sites above 1000 m, write the 28 °C ambient limit into the UPS room cooling design point.
- Add to the site programme the 8-hour battery recharge needed when storage exceeds three months and the on-site start-up step with the manufacturer's engineer.
Who should read it
Electrical engineers writing UPS tender specifications, consultants evaluating bids and owner's representatives setting commissioning acceptance criteria.
Document contents
- Part 1 General
- 1.1 Summary
- 1.2 Standards
- 1.3 Submittals
- 1.4 Qualifications & Quality Assurance
- 1.5 Delivery, Storage, and Handling
- 1.6 Environmental Requirements
- 1.7 Warranty
- 1.8 Service and Spare Parts
- 1.9 Maintenance, Accessibility and Self Diagnostics
- Part 2 Products
- 2.1 Acceptable Manufacturers/Product
- 2.2 Product Specification
- 2.3 Modes of Operation
- 2.4 Component Description
- 2.5 System Controls and Indicators
- 2.6 Mechanical Design and Ventilation
- 2.7 Battery
- 2.8 Optional External Maintenance Bypass
- Part 3 Execution
- 3.1 Site Testing Start-Up
- 3.2 Maintenance Training
Publication details
- Authors
- DSPM
- Publisher
- DSPM
- Year
- Year not stated
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
No document-specific redistribution permission was established. Bibliographic reference only.
Citation
DSPM DSPM Power Lynx 3 three-phase online UPS technical specifications. DSPM. https://dspowerm.co/downloads/uninterruptible_power_systems_indoor_three_tech_specs.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.