Master+: Reduce Costs, Increase Reliability (Riello UPS-RWE smart grid-ready UPS)
Riello UPS
Riello UPS's April 2020 white paper: a Master Plus HE UPS with a bi-directional rectifier, in partnership with RWE, projects 21% lower capital cost (341,500 euros instead of 434,000) and 50% lower operating cost for a typical 1 MW data centre.
On this page
Overview
The white paper argues that UPS batteries waiting only as emergency backup are under-used, and that a UPS can become a 'virtual power plant' by providing grid frequency response and similar services. The joint Riello UPS and RWE solution is based on a modified Master Plus HE three-phase online UPS with a special rectifier that allows bi-directional power flow with the grid. It uses premium lead-acid or high power density Li-ion batteries and RWE's monitoring software.
In the model RWE subsidises the cost of the expensive premium batteries and takes the energy-market trading risk; the data centre does not take part in the market but benefits from lower capital and operating costs. The battery is divided into sections: one only for emergency backup, the other storing energy for Firm Frequency Response (FFR); in a power failure the remaining energy in the commercial section can be added to the main backup to lengthen runtime. FFR has three speeds: primary (within 10 seconds, sustained 20 seconds), secondary (within 30 seconds, sustained 30 minutes) and high frequency (within 10 seconds, sustained indefinitely); the grid needs an average of 800 MW of FFR capacity.
The business-case table is for a typical 1 MW data-centre load with 10 minutes of runtime and 1 MWh of frequency response: UPS 220,000 euros, batteries (with cabinets) 185,000 euros against about 92,500, installation 25,000 and commissioning 4,000; total 341,500 euros instead of 434,000 (21% saving). Annual operating cost is 3,500 euros instead of 7,000 (UPS maintenance 2,500 against 5,000, remote monitoring 1,000 against 2,000), a 50% saving. The figures are illustrative and project dependent.
This is a white paper by a manufacturer and its partner and rests on UK grid mechanisms (FFR, National Grid). The pilot has run at RWE's Essen headquarters since September 2018: a 100 kW secured load, two 200 kW Master+ UPS and two high-performance battery cabinets of 192 kWh nominal; a second pilot in the UK was under construction for Q3 2019.
Key points
- The solution is a modified Master Plus HE UPS with a bi-directional rectifier; premium lead-acid or high power density Li-ion batteries are used.
- RWE subsidises the premium battery cost and takes the market trading risk; the data centre does not take part in the market.
- The battery has two sections: an emergency-only backup section and a commercial section storing energy for FFR; in a failure the commercial section's remaining energy can add to backup (runtime up to 30 minutes).
- FFR response speeds: primary within 10 s sustained 20 s, secondary within 30 s sustained 30 min, high frequency within 10 s sustained indefinitely; the grid needs an average of 800 MW of FFR.
- According to National Grid, if just 5% of peak demand were met by DSR and energy storage it would equal the electricity of a new nuclear plant.
- Example 1 MW data centre (10 min runtime, 1 MWh frequency response): capital cost 341,500 euros instead of 434,000 (21% saving); batteries about 92,500 euros instead of 185,000.
- Annual operating cost 3,500 euros instead of 7,000 (50% saving).
- Disadvantage: slightly more space is needed for the additional batteries.
- Pilot: since September 2018 in Essen, a 100 kW load, two 200 kW Master+ UPS and two 192 kWh battery cabinets.
Using it in design
- If participation in grid services (such as FFR) is considered, check in the specification the UPS rectifier's bi-directional power flow capability and the local grid operator's rules.
- Split battery capacity into an emergency backup section and a commercial section; verify that the backup section meets the autonomy target on its own.
- In the capital cost comparison, assess battery subsidy, maintenance and remote monitoring cost together, remembering that the figures are project dependent.
- Add extra floor area and floor loading for the additional battery cabinets to the layout plan.
- Take battery monitoring (mandatory 24/7 remote monitoring) and preventive maintenance into the operating procedure.
- Write into the contract a commitment from the manufacturer and operator that battery use for grid services does not reduce the UPS's backup role.
Who should read it
Electrical designers, investment decision makers and energy managers investing in data-centre UPS and assessing grid services and demand-side response revenue.
Document contents
- An evolving energy mix
- Essential but underutilised
- Rethinking the role of a UPS
- What is the Riello UPS-RWE Master+ model
- Exploring the possibilities: FFR
- The business case for data centres
- The benefits of the Riello UPS-RWE Master+ model
- Putting theory into practice: pilot plant
Related standards
- IEC 62040-3
Publication details
- Authors
- Riello UPS
- Publisher
- Riello UPS
- Year
- 2020
- Document number
- Whitepaper No. 04-2020
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Footer '© Riello UPS | All Rights Reserved'; free PDF.
Citation
Riello UPS (2020). Master+: Reduce Costs, Increase Reliability (Riello UPS-RWE smart grid-ready UPS). Riello UPS. Whitepaper No. 04-2020. https://www.riello-ups.com/uploads/file/777/2777/Riello_UPS_WhitePaper_04-20__MASTER__EN.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.