Data centre energy performance reporting (Swedish Energy Agency)
Original title Data centre energy performance reporting
Swedish Energy Agency
Swedish Energy Agency guidance: Act 2025:570, in force from 1 July 2025, requires data centres with at least 500 kW installed IT power demand to report annual data to an EU-wide database.
On this page
Overview
The Swedish Energy Agency page explains the Act on the Disclosure of Information on the Energy Performance of Data Centres (2025:570), which took effect on 1 July 2025. It requires owners or operators of data centres with installed IT power demand of at least 500 kW to publish annual energy-performance information by reporting to an EU-wide database. Centres used for security-sensitive activities, defence or civil contingency under the Protective Security Act are exempt.
The Act aims to promote energy efficiency and renewable energy use and to reduce the environmental impact of data centres; data reported to the EU database will underpin a common Union-wide system for assessing data-centre sustainability. The key dates are notification to the Agency by 27 April 2026 and reporting in the EU database by 15 May 2026, covering the full year 2025.
The process has six steps: notify the Agency by email (company name, registration number, email), create an EU Login account, receive the Agency's confirmation email and reference number, apply for access as a reporting entity representative (account type, justification: data centre operator, country: Sweden), await access approval and report. Companies that notified before do not notify again. The data to report are set out in Annexes I and II of Delegated Regulation 2024/1364: energy use, water use, waste heat and contribution to grid services, among others.
Information in the database is confidential; to the public it is shown in aggregated form at member-state and EU level under Annex IV of the Delegated Regulation. The page also refers to the Energy Efficiency Directive (2023/1791): Article 12 (information for centres above 500 kW), Article 12.4 (promoting EU Code of Conduct best practices for facilities of 1 MW and above) and Article 26.6 (centres above 1 MW total energy supply must use waste heat unless technically or economically infeasible).
Key points
- Act 2025:570 took effect on 1 July 2025.
- Scope: data centres with installed IT power demand of at least 500 kW; security, defence and civil-contingency uses under the Protective Security Act are exempt.
- Notification is due by 27 April 2026 and EU database reporting by 15 May 2026, covering the full year 2025.
- Process: email notification to the Agency, EU Login account, confirmation email and reference number, access request, reporting.
- Annexes I and II of Delegated Regulation 2024/1364 set the data: energy, water, waste heat and contribution to grid services.
- Data are confidential; the public sees aggregated figures at member-state and EU level.
- Directive Article 12 requires information from facilities above 500 kW; Article 12.4 encourages the EU Code of Conduct at 1 MW and above.
- Directive Article 26.6 requires data centres above 1 MW total energy supply to use waste heat or justify infeasibility; the Swedish legislative proposal was out for consultation until 4 November 2025.
Using it in design
- For Swedish facilities above 500 kW installed IT power, prepare measurement points for energy, water and waste heat in the design; reporting covers Annex I and II items.
- Assess waste-heat recovery from the start for facilities above 1 MW and document the technical or economic justification if infeasible.
- Add the reporting calendar (April notification, May report, previous-year data) to the operations plan.
- Set up metering and logging that can track participation in grid services.
- Include EU Code of Conduct best practices in the design checklist for facilities of 1 MW and above.
Who should read it
Owners and operators of data centres in Sweden, their design teams and compliance managers tracking EU reporting obligations.
Document contents
- Scope and purpose of the Act
- Key dates
- Notification and registration step by step
- Data to be reported
- How reported data is handled and made public
- Related articles of the Energy Efficiency Directive
Publication details
- Authors
- Swedish Energy Agency
- Publisher
- Swedish Energy Agency
- Year
- Year not stated
- Document language
- English
- Source type
- Government / public
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official public publisher text inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.
Citation
Swedish Energy Agency Data centre energy performance reporting. Swedish Energy Agency. https://www.energimyndigheten.se/en/climate/climate/data-centre-energy-performance-reporting/
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.