Comparing UPS System Design Configurations
Schneider Electric · Kevin McCarthy, Victor Avelar
Compares capacity (N), isolated redundant, parallel redundant, distributed redundant and system-plus-system UPS architectures on availability, cost and efficiency.
On this page
Overview
The paper covers five principal UPS architectures: capacity (N), isolated redundant, parallel redundant (N+1), distributed redundant (catcher, with and without STS, tri-redundant) and system-plus-system 2N/2(N+1). Each gets a one-line description and pros and cons, backed by a Markov/RBD availability comparison.
Each architecture is related to Uptime Tier classes and to an indicative first cost per rack. The paper also shows how module size in N+1 systems sets per-module load and therefore efficiency: for a 240 kW load, 2 x 240 kW modules run at 50% and 5 x 60 kW modules at 80%.
Modelled availability is 99.92% for N, 99.93% for N+1, 99.9994% for distributed redundant and 99.99997% for 2(N+1). In the analysis, isolated redundant and N systems showed the same unreliability (about 1.8% per year). N systems need 2-4 hours a year of full shutdown for system-level maintenance unless a wrap-around bypass exists.
The conclusion is that 2(N+1) feeding dual-corded loads directly gives the highest availability. The selection guide points N+1 or isolated redundant at IT loads typically under 500 kW, distributed redundant above 1 MW, and 2N/2(N+1) at large multi-MW sites. The figures are comparative and should not be read as absolute values.
Key points
- Modelled availability: N 99.92%; isolated redundant 99.93%; N+1 99.93%; distributed redundant catcher 99.9989%; distributed redundant 99.9994%; 2(N+1) 99.99997%.
- Indicative capex: Tier I $13.5-18k/rack; Tier II $18-24k; Tier III $24-30k; Tier IV $36-42k (30 ft²/rack, 2.3-3.8 kW/rack basis).
- N+1 module loading for a 240 kW load: 2x240 kW 50%; 3x120 66%; 4x80 75%; 5x60 80%.
- Typical 3-phase module overload rating: 125% for 10 minutes before transfer to static bypass.
- Isolated redundant and N systems had the same unreliability (about 1.8% per year) in the analysis.
- N systems need 2-4 h/yr full shutdown for system-level maintenance unless a wrap-around bypass exists.
- Selection guide: N+1 / isolated redundant typically under 500 kW IT; distributed redundant above 1 MW; 2N/2(N+1) for large multi-MW.
Using it in design
- Assess N, isolated redundant, N+1, distributed redundant (catcher/STS), tri-redundant, 2N and 2(N+1) in the topology library, and label availability values as comparative rather than absolute.
- Compute per-module load as load / (number of modules x module kW) and feed it to the UPS efficiency curve.
- Map each topology to a Tier hint and scale the per-Tier cost ranges to the current year in estimates.
- Show a warning that N systems need a full shutdown for maintenance unless a wrap-around bypass is provided.
Who should read it
Electrical designers choosing a UPS architecture and decision makers weighing redundancy against cost.
Related standards
- Uptime Tier Standard: Topology
- TIA-942
- EN 50600-2-2
- IEEE 3006.7
Publication details
- Authors
- Kevin McCarthy; Victor Avelar
- Publisher
- Schneider Electric
- Year
- 2016
- Document number
- WP 75
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
Kevin McCarthy; Victor Avelar (2016). Comparing UPS System Design Configurations. Schneider Electric. WP 75. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_SADE-5TPL8X_EN
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.