Analysis of Data Center Architectures Supporting Open Compute Project (OCP)
Schneider Electric · Kevin Brown, Wendy Torell
A Schneider Electric white paper (WP 228, 2016) that costs reference designs for a 9.6 MW, 10 kW/rack facility to show what Open Compute racks with rack-level power shelves and battery backup units mean for the upstream electrical system.
On this page
Overview
The paper examines what Open Compute racks, with consolidated rack-level power shelves and battery backup units (BBUs), mean for the electrical system upstream of the rack. Costed reference designs for a 9.6 MW, 10 kW/rack facility compare a traditional 2N (tier 3) design, an OCP-specific 1N design, an OCP-specific 2N design with no central UPS, and a simplified 2N design keeping one UPS-backed path so traditional and OCP loads can coexist. The cost basis is actual project costs normalised in EUR/W from MV switchgear through the server power supplies.
Relative to traditional 2N, OCP-specific 1N saves 45% of capex and OCP-specific 2N saves 25%; the simplified mixed-load 2N carries a 3% premium over OCP-specific 2N. Simplified 2N with 100% OCP loads is 1.95 EUR/W, adding 0.21 EUR/W for 100% traditional loads. In the waterfall from traditional 2N to OCP 1N, removed redundancy saves 0.79 EUR/W (31%), UPS removal 0.20 EUR/W (8%) and server PSU consolidation 0.31 EUR/W (12%), against a 0.14 EUR/W (5%) premium for rack BBUs. Architecture simplification (no cross-ties, extra breakers, load bank or second UPS) accounts for 0.36 EUR/W, 14 of the 25 percentage points saved by OCP 2N, independent of load type.
PSU cost per IT watt is 0.07 EUR x redundancy 2 x oversizing 3 = 0.42 EUR for traditional, versus (0.06 + 0.03 shelf) x 1.2 = 0.11 EUR (1N) or 0.22 EUR (2N) for OCP. Varying traditional PSU oversizing from 2 to 4.5 gives a premium of 5-15% at a 50/50 load mix and 8-26% at 100% traditional load. Battery assumptions are VRLA, 5 min, centralised in the UPS for traditional and lithium-ion, 4 min, rack-based for OCP, both at 25 C. Li-ion stores the same energy in about one third of the footprint and weight of VRLA, enabling rack-level batteries. The paper adds that battery chemistry should be considered separately from battery location and tabulates pros and cons of central versus rack-level storage.
Key points
- Reference: 9.6 MW at 10 kW/rack; cost from MV switchgear to server PSUs in EUR/W.
- Capex versus traditional 2N: OCP-specific 1N saves 45%, OCP-specific 2N saves 25%.
- Simplified mixed-load 2N costs a 3% premium over OCP-specific 2N.
- Simplified 2N with 100% OCP loads is 1.95 EUR/W; +0.21 EUR/W for traditional loads.
- Waterfall 2N to OCP 1N: redundancy removal 0.79 EUR/W (31%), UPS removal 0.20 (8%), PSU consolidation 0.31 (12%) savings; rack BBUs 0.14 (5%) premium.
- Architecture simplification is 0.36 EUR/W, 14 of OCP 2N's 25 points.
- PSU cost per IT watt: traditional 0.42 EUR; OCP 0.11 (1N) or 0.22 EUR (2N).
- Li-ion stores the same energy in about one third of VRLA's footprint and weight.
Using it in design
- Compare traditional 2N, OCP 1N, OCP 2N without central UPS and with 1N BBU, and simplified mixed-load 2N with a single UPS path. Specify power-shelf capacity, BBU runtime and PSU redundancy for each rack type.
- Flag OCP 1N as not concurrently maintainable; when OCP racks have no BBU require an upstream UPS on at least one path.
- Warn when the declared tier or redundancy target conflicts with the chosen topology.
- Separate costs at MV, LV, pod and rack level. State server PSU cost and the oversizing factor, and calculate cross-tie, load-bank and second-UPS savings separately.
Who should read it
Electrical designers and investment decision makers evaluating OCP or rack-level power architectures.
Related standards
- OCP Open Rack
- Uptime Institute Tier Standard: Topology
- ANSI/TIA-942
Publication details
- Authors
- Kevin Brown; Wendy Torell
- Publisher
- Schneider Electric
- Year
- 2016
- Document number
- WP 228
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
Kevin Brown; Wendy Torell (2016). Analysis of Data Center Architectures Supporting Open Compute Project (OCP). Schneider Electric. WP 228. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_VAVR-A5AJW3_EN