The Potential of Data Center Energy Demand To Provide Grid Flexibility

Current Sustainable/Renewable Energy Reports (Springer Science and Business Media LLC) · Constance Crozier, Matthew Liska

Crozier and Liska's open-access review of April 2025 examines how data centres can provide grid flexibility and shows that operators respond to electricity price only during extreme events.

On this page

Overview

The review appeared in Current Sustainable/Renewable Energy Reports (volume 12, article 12, 2025). It starts from the premise that AI is rapidly increasing data-centre demand, that in the United States data centres may take about 10% of national electricity demand by the end of the decade, and that the grid has not seen such a sudden demand increase before. The focus is compute data centres, the fastest-growing group.

The flexibility mechanisms covered are: using the UPS protection system for regulation and reserve services, rerouting jobs between data centres, smart job scheduling, lowering CPU and GPU clock rates, pre-cooling coolant, and flexible job characteristics. Most academic work centres on job scheduling. Cryptocurrency mining is also widely studied because of its continuous and interruptible nature, but it is mostly done in dedicated ASIC facilities.

The authors' own finding is that real energy-use data show centres are not sensitive to electricity price outside extreme events. A GPU rents for about $2/hour while drawing an average of 0.32 kW; electricity costs under $0.04, and the price at which energy would outweigh job revenue is $6,250/MW, a level historically reached only in events such as the Texas blackout.

The review concludes that although many mechanisms have been proposed, little is known about the scale or cost of the potential. It argues for incentives such as dynamic pricing so users offer flexible job parameters, and for non-price incentives for operators. It is a literature review, not a new measurement campaign; the only experiment is a clock-rate reduction test on a single A100 GPU.

Key points

  1. Data centres are estimated to use about 10% of US national electricity demand by the end of the decade.
  2. Flexibility mechanisms: UPS regulation and reserve, job rerouting, smart scheduling, clock-rate modulation, pre-cooling, flexible job characteristics.
  3. Underclocking a single A100 GPU cut power by 40% for a 22% drop in raw performance.
  4. Data centres spend 20-40% of their energy on cooling; a B200 GPU has a 1,200 W TDP and a 72-GPU rack draws about 120 kW.
  5. NVIDIA's V100 (2017) had a 300 W TDP and the B200 (2025) has 1,200 W.
  6. A GPU rents for about $2/hour on average and draws 0.32 kW; electricity cost is under $0.04.
  7. Energy cost exceeds job revenue only at $6,250/MW, reached historically only in extreme events such as the Texas blackout.
  8. In a survey of Chinese operators, owners resisted flexibility and did not want the UPS investment to risk safety in an emergency.
  9. Crypto mining is inherently flexible but mostly runs on ASIC facilities, and its price sensitivity moves with exchange rates.

Using it in design

  • If the UPS is considered for grid services, write the emergency priority explicitly into the contract and control logic; operators will not compromise the UPS's assurance role.
  • When sizing cooling for pre-cooling (thermal storage), allow for cooling at 20-40% of energy and recognise that the share may differ in high-density liquid-cooled racks.
  • In grid-connection discussions, base any flexibility commitment on contracted curtailment and reserve services, not on price signals.
  • For high-density GPU racks (for example 120 kW), include power capping and clock-rate reduction as a load-shedding tool for emergencies in the design.
  • For operators with several sites, add the ability to run the same job in two centres to the architecture if spatial flexibility is wanted.

Who should read it

Data-centre planners assessing grid connection and demand-side flexibility, energy system analysts, and power and cooling designers.

Document contents

  1. Introduction
  2. Background on Data Centers
  3. Background on Grid Flexibility (regulation and reserve, energy arbitrage)
  4. Data Center Flexibility Mechanisms (UPS, rerouting jobs, smart scheduling, clock rate modulation, pre-cooling, flexible job characteristics, cryptocurrency mining)
  5. Quantifying Flexibility Potential
  6. Incentivizing Flexibility (users and data centers)

Publication details

Authors
Constance Crozier; Matthew Liska
Publisher
Current Sustainable/Renewable Energy Reports (Springer Science and Business Media LLC)
Year
2025
Document language
English
Source type
Scientific
Access
Free to read
Licence
CC BY 4.0: share with attribution
Original licence note

Publisher-deposited Crossref licence metadata: https://creativecommons.org/licenses/by/4.0 (OpenAlex: cc-by); landing page blocks automated fetch, abstract read via Crossref/OpenAlex. Round 1 ingestion retains bibliographic metadata only; no local full text is redistributed.

Citation

Constance Crozier; Matthew Liska (2025). The Potential of Data Center Energy Demand To Provide Grid Flexibility. Current Sustainable/Renewable Energy Reports (Springer Science and Business Media LLC). https://doi.org/10.1007/s40518-025-00258-9

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.