Elektrik Depolama Ünite veya Tesislerinin Yan Hizmetlerde Kullanılmasına Dair Teknik Kriterler ve Test Prosedürleri

Türkiye Elektrik İletim A.Ş.

A 25-page procedure from TEİAŞ, the Turkish transmission system operator, setting the conditions and performance tests for electricity storage units and facilities that take part in ancillary services: primary and secondary frequency control require at least 30 MW connected to the transmission system and fast frequency control at least 50 MW; UPS systems installed for use during power outages and pumped-storage plants are outside its scope.

On this page

Overview

The procedure sets out how storage units and facilities built under the Regulation on Storage Activities in the Electricity Market take part in the services defined in the Electricity Market Ancillary Services Regulation. Its legal basis includes Electricity Market Law No. 6446 and the Electricity Grid Regulation. For data-centre design the most important provision is the second paragraph of Article 2: UPS systems installed for use during a power outage are excluded from these technical criteria. For grid connection, design and operating rules it refers to a separate document, the Grid Connection and Compliance Criteria for Electricity Storage Facilities.

Part three lists the participation conditions for each service, open to storage integrated with a generation plant, stand-alone storage facilities and generation plants with storage. For primary frequency control, the facility must activate half of the reserve within 15 seconds and all of it within 30 seconds at a 200 mHz deviation, and sustain that output for at least 15 minutes; response delay must not exceed 2 seconds, the dead band must not exceed ±10 mHz, and the ratio of reserve energy capacity to reserve power capacity must be at least 1.25. For secondary frequency control the delay is at most 30 seconds, the ramp rate at least 1.5% of installed power per second, and the energy to power ratio at least 2.

The fast frequency control service demands far shorter times: the full synchronous connection support reserve must be active within 200 milliseconds and the full frequency support reserve within one second. Participation in reactive power control is mandatory for facilities of 30 MW and above connected to the transmission system, and in limited frequency sensitivity mode for facilities of 50 MW and above; facilities of 10 MW and above must provide inertia support by responding to phase jumps and to rate of change of frequency. Storage units integrated with consumption are exempt from the reactive power control service.

Monitoring is hourly. In the energy adequacy calculation the battery's operating state of charge is taken to have a lower limit of 5% and an upper limit of 95%. If active output stays outside the tolerance band for no more than 10% of the settlement period the service counts as delivered, and at 50% or more as not participated. Annex 1 defines three recharging methods for restoring the state of charge changed by frequency control; Annex 2 gives performance test procedures for primary frequency control, reactive power control and black start services. Test procedures for secondary frequency control are to be announced by 31 December 2028.

Key points

  1. Out of scope: pumped-storage hydroelectric plants and UPS systems installed for use during a power outage (Article 2/2).
  2. To take part in primary and secondary frequency control, a facility must be connected to the transmission system with installed storage power of 30 MW or more.
  3. Primary frequency control: 50% of the reserve within 15 seconds and all of it within 30 seconds at a 200 mHz deviation; sustained for at least 15 minutes; response delay at most 2 seconds; dead band at most ±10 mHz; energy to power ratio at least 1.25.
  4. Secondary frequency control: delay at most 30 seconds, ramp rate at least 1.5% of installed power per second, energy to power ratio at least 2.
  5. Fast frequency control: installed power of at least 50 MW; synchronous connection support reserve active within 200 ms and frequency support reserve within 1 second.
  6. Reactive power control is mandatory at 30 MW and above; stand-alone storage facilities offer reactive capacity up to 40% of installed power at the connection point; the voltage droop is set by TEİAŞ between 2% and 7%.
  7. Limited frequency sensitivity mode is mandatory at 50 MW and above, and the inertia support service at 10 MW and above.
  8. For monitoring, the battery's operating state of charge is taken to run from a 5% lower limit to a 95% upper limit.
  9. Recharging Method 1: while frequency is inside the ±10 mHz dead band, energy up to 10% of that hour's reserve capacity may be exchanged with the system.
  10. Facilities in the same settlement unit cannot take part in primary and secondary frequency control at the same time, and capacity committed to ancillary services cannot be used in other market activities.

Using it in design

  • Treat data-centre UPS batteries installed only to carry the load through an outage as outside these criteria, and record that reasoning with the article number in the design report.
  • If the battery system is designed to export energy to the grid or earn ancillary service revenue, handle the project as a storage facility and check the 30 MW and 50 MW thresholds against the business model.
  • For storage that will take part in frequency control, size energy capacity against power capacity: a ratio of at least 1.25 for primary and at least 2 for secondary, within the 5% to 95% state-of-charge limits.
  • Do not serve critical load backup and ancillary service reserve from the same battery; committed reserve cannot be used for another purpose, so calculate backup time on separate capacity.
  • For grid connection requirements, review TEİAŞ's Grid Connection and Compliance Criteria for Electricity Storage Facilities separately.

Who should read it

Electrical engineers, investors and regulatory compliance teams planning battery energy storage and data-centre energy infrastructure in Türkiye.

Document contents

  1. Birinci Bölüm: Amaç, Kapsam, Dayanak ve Tanımlar
  2. İkinci Bölüm: Elektrik Depolama Ünite/Tesislerinin Şebeke Bağlantısı, İzlenmesi ve Kontrol Edilmesine İlişkin Genel Hükümler
  3. Üçüncü Bölüm: Elektrik Depolama Ünite veya Tesislerinin Yan Hizmetlere Katılımına İlişkin Teknik Kriterler
  4. Dördüncü Bölüm: Çeşitli ve Son Hükümler
  5. Ek 1. Yeniden Depolama Yöntemleri
  6. Ek 2. Elektrik Depolama Ünite veya Tesislerinin Test Prosedürleri

Publication details

Authors
Türkiye Elektrik İletim A.Ş.
Publisher
Türkiye Elektrik İletim A.Ş.
Year
Year not stated
Document language
Turkish
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official 25-page PDF downloaded and read. The PDF carries no publication date.

Citation

Türkiye Elektrik İletim A.Ş. Elektrik Depolama Ünite veya Tesislerinin Yan Hizmetlerde Kullanılmasına Dair Teknik Kriterler ve Test Prosedürleri. Türkiye Elektrik İletim A.Ş.. https://webim.teias.gov.tr/file/70ddcfe5-9018-43f3-b708-4c69399a18a6?download=

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.