Küçük Bir Veri Merkezinin İklimlendirme Ünitelerine Yönelik Baypas Yönteminin Enerji ve Ekonomik Analizi
Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi · Hamza Salih Erden, İsmail Türkmen
Erden and Türkmen (Gazi University Faculty of Engineering and Architecture Journal, 2022) calculate a 1.6-year payback for CRAH bypass in a 180 m² small data centre, with 8 induced (iBP) or 7 forced (fBP) bypass fans.
On this page
Overview
The paper assesses the energy and economic feasibility of the computer room air handling (CRAH) bypass (BP) method in enclosed-aisle data centres, applied for the first time to an operating facility. In this method BP fans supply part of the servers' air demand through floor openings, so CRAH fans run slower and fan power falls with the cube of speed. Earlier studies used hypothetical data centres or test rigs and lacked economic requirements.
The method uses a reduced-order model that combines a flow network model at room level with a thermodynamic model of the cooling infrastructure. The pilot site is a small air-cooled, raised-floor data centre of 180 m²; seven CRAC units (Liebert, Emerson and Stulz) run at constant speed with 12,910-24,000 m³/h airflow and 3.8-8.5 kW fan power. Induced (iBP) and forced (fBP) bypass fan layouts are tested with 28, 14, 10 and 8 fans (iBP) and 9 and 7 fans (fBP), in combination with unit shutdown and variable speed drives (VSD).
Results show that leakage and number of BP fans affect energy performance only slightly but drive the economics. In unit-shutdown scenarios the lowest cooling infrastructure power is 45 kW, falling to 30 kW with VSD when CRAC fan speed is cut to 40%. For 8-fan iBP and 7-fan fBP the net present value is at least 2.5 million TL, payback 1.6 years and modified rate of return above 25%. For 28-fan iBP (one fan per opening) payback is 3-4 years and the internal rate of return below 20%.
The study rests on a single pilot site and uses 2021-era assumptions such as an electricity tariff of 0.73 TL/kWh and euro-based fan costs. The authors note that variable-speed fans would improve the economics further if the air handlers allow.
Key points
- Pilot site: 180 m², air-cooled, raised floor, seven CRACs (12,910-24,000 m³/h, 3.8-8.5 kW fan).
- Scenarios: iBP with 28, 14, 10 and 8 fans; fBP with 9 and 7 fans; unit shutdown and VSD options.
- With unit shutdown the lowest cooling infrastructure power is 45 kW; with VSD down to 30 kW.
- In VSD scenarios CRAC fan speed is cut to 40%.
- 8-fan iBP and 7-fan fBP: NPV at least 2.5 million TL; payback 1.6 years; MIRR above 25%.
- 28-fan iBP (one fan per opening): payback 3-4 years, IRR below 20%.
- Unit shutdown with 8-14 BP fans gives NPV of 2-3 million TL.
- Leakage and BP fan count affect energy little and economics a lot; electricity price 0.73 TL/kWh.
Using it in design
- In existing enclosed-aisle, raised-floor halls, evaluate BP fans to cut CRAH fan power together with the investment payback.
- Reduce the BP fan count to 7-8 instead of one per opening to improve economics; energy performance changes little.
- Where CRAHs are far oversized for the load, apply controlled shutdown of surplus units first.
- Add variable speed drives to CRAHs where possible; staged shutdown also gives meaningful savings for fixed-speed units.
- Recompute the feasibility with current local electricity tariffs and fan investment costs.
Who should read it
Mechanical engineers and operators wanting to cut cooling energy in existing small and mid-size data centres.
Document contents
- Introduction
- Method (flow network and cooling infrastructure thermodynamic model, pilot data centre, economic analysis)
- Findings and discussion (iBP, fBP and economic results)
- Conclusions
- References
Publication details
- Authors
- Hamza Salih Erden; İsmail Türkmen
- Publisher
- Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi
- Year
- 2022
- Document number
- 37(4), 1883–1898
- Document language
- Turkish
- Source type
- Scientific
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Tam metin yayıncının veya üniversitenin açık kaynağından okundu. Açık erişim, ticari yeniden dağıtım izni olarak yorumlanmadı; yalnızca bağlantı, metadata ve özgün kısa özet tutulur. Ana metin Türkçedir; ilk sayfa İngilizce grafik özet içerir. Eski maliyet ve geri ödeme sonuçları güncel fiyat veya genel tasarruf garantisi olarak aktarılmadı.
Citation
Hamza Salih Erden; İsmail Türkmen (2022). Küçük Bir Veri Merkezinin İklimlendirme Ünitelerine Yönelik Baypas Yönteminin Enerji ve Ekonomik Analizi. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi. 37(4), 1883–1898. https://doi.org/10.17341/gazimmfd.897270