This paper by Uğur Yüzgeç and Arif Günel, published in the Bilecik Şeyh Edebali University Journal of Science (2015, vol. 2, no. 2), describes the electrical infrastructure of the university's Tier III-oriented campus data centre: a dedicated medium-voltage kiosk, a 250 kVA transformer, a 250 kVA prime-rated generator and two 40 kVA UPSs on the A and B lines.

On this page

Overview

The paper has two parts. The first summarises what a data centre is, the Uptime Institute Tier levels and the Green Grid metrics PUE and DCiE, with a table that rates PUE 3.0 as very inefficient, 2.0 as average and 1.2 as very efficient. The second presents, as a worked case, the energy planning of the campus data centre project run by the IT department of Bilecik Şeyh Edebali University (BŞEÜ). The facility is laid out as three areas, an energy room, a network aggregation room and a central system room, and the energy room is separated from the system room because of its higher risk.

The design starts from a failure in 2011. On the old non-redundant infrastructure the UPS faulted and dropped the load while mains was present; later, during a weekend medium-voltage fault, the generator ran for a long period, ran out of fuel, and the servers shut down with data loss in the staff automation system. The new design gives the data centre its own medium-voltage cubicle and a 250 kVA oil-filled transformer, so faults and long maintenance outages in other campus buildings do not reach it. The main distribution board busbar receives two lines, one from the transformer main board and one from the building generator board, controlled by motorised moulded-case breakers.

Capacity planning allowed for roughly 60% growth in student numbers and 70% growth in staff over ten years, for university and industry projects, and for hosting the provincial disaster recovery centre. With 160 kVA for cooling and about 4.5 kVA for each of 16 server racks, a 250 kVA prime-rated generator was selected. The ideal Tier III arrangement is described as two synchronised sets in 1+1; one set was installed in the first phase, and the building's separate 250 kVA generator was also tied into the line. The cooling boards feed 6 in-row units, 2 chillers and 3 pumps from upstream of the UPS.

On the UPS side, two 40 kVA units were commissioned for the A and B lines, and the boards and cabling were prepared for four units in future. The batteries are sealed maintenance-free 12 V blocks providing at least 20 minutes of bridging time. Earthing was built as three systems separate from the building, and the data centre earth resistance is below 2 ohms. The authors report that controlled outage, fault and maintenance scenarios run after the move showed the redundant infrastructure to be adequate. The capacities are examples from this project; the paper contains no general sizing method and no measured PUE value.

Key points

  1. The BŞEÜ data centre was designed with infrastructure capable of reaching Tier III certification; the paper's Tier table gives 99.982% availability and 1.5 hours of downtime for Tier III.
  2. A dedicated medium-voltage concrete kiosk serves the data centre: incoming cubicle, transformer protection cubicle with circuit breaker, 250 kVA oil-filled transformer, transformer main distribution board and automatic power-factor correction.
  3. Load assumptions: 160 kVA for cooling and about 4.5 kVA per rack for 16 racks; generator 250 kVA prime.
  4. The generator set was selected to run 24 hours at prime rating and to carry 110% load for 1 hour; the alternator is rated above 1.3 times the set rating and withstands 150% load for 1 minute.
  5. The generator was tested for 30 minutes each at 25%, 50%, 75%, 100% and 110% load.
  6. Two 40 kVA UPSs were installed for the A and B lines, with infrastructure planned for four UPS connections.
  7. Batteries are sealed maintenance-free 12 V blocks with at least 20 minutes of bridging time; the UPS is monitored through RS-232 and an SNMP card.
  8. Earthing consists of three systems separate from the building (data centre main, medium-voltage star point, medium-voltage protective); data centre earth resistance is below 2 ohms.
  9. PUE table: 3.0 very inefficient, 2.5 inefficient, 2.0 average, 1.5 efficient, 1.2 very efficient; designs that ignore energy efficiency can range from PUE 2 to 5.

Using it in design

  • For campus data centres, consider separating the medium-voltage cubicle and transformer from other buildings; a shared feed brings neighbouring faults and maintenance outages into the facility.
  • Size the generator from the cooling load, rack count times power per rack, and auxiliary loads; the paper's example goes from 160 kVA of cooling and 16 racks at 4.5 kVA to a 250 kVA set.
  • Verify generator fuel autonomy against a long mains outage; the 2011 failure in the paper ended when the fuel ran out.
  • Build UPS boards and cabling for the final module count (4 in the example) and commission only the units needed in the first phase (two 40 kVA units in the example).
  • At commissioning, load-test the generator at 25%, 50%, 75%, 100% and 110%, then prove redundancy with controlled outage and maintenance scenarios.
  • Design the data centre earthing separately from the building earthing and compare the measured resistance with the 2 ohm target.

Who should read it

IT managers building small and medium data centres at universities and public bodies, and the engineers preparing the electrical design for such facilities.

Document contents

  1. I. Giriş (Introduction)
  2. II. Veri Merkezi (The data centre)
  3. A. Veri Merkezi Standartları (Data centre standards)
  4. B. Veri Merkezi Enerji Planlama Aşamaları (Energy planning stages)
  5. III. Bir Veri Merkezi Enerji Planlaması Örneği (A data centre energy planning example)
  6. A. Enerji Alt Yapısının Planlanması (Planning the energy infrastructure)
  7. B. Orta Gerilim Beton Köşk Tasarımı (Medium-voltage concrete kiosk design)
  8. C. Jeneratör Seçimi (Generator selection)
  9. D. Kesintisiz Güç Kaynağı Seçimi (UPS selection)
  10. E. Topraklama (Earthing)
  11. IV. Sonuçlar (Conclusions)

Publication details

Authors
Uğur Yüzgeç; Arif Günel
Publisher
Bilecik Şeyh Edebali Üniversitesi Fen Bilimleri Dergisi
Year
2015
Document number
2(2), 17–24
Document language
Turkish
Source type
Scientific
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Tam metin yayıncının veya üniversitenin açık kaynağından okundu. Açık erişim, ticari yeniden dağıtım izni olarak yorumlanmadı; yalnızca bağlantı, metadata ve özgün kısa özet tutulur. Yıl PDF sayı künyesindeki 2015 değeridir; DergiPark yükleme/yayımlama alanı 1 Temmuz 2016 gösterir. Makalenin Tier sınıflandırma tablosu güncel sertifikasyon kanıtı olarak aktarılmadı.

Citation

Uğur Yüzgeç; Arif Günel (2015). Üniversitelere Yönelik Bir Veri Merkezinin Enerji Planlaması. Bilecik Şeyh Edebali Üniversitesi Fen Bilimleri Dergisi. 2(2), 17–24. https://dergipark.org.tr/tr/download/article-file/207506

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.