WP#49 - PUE: A Comprehensive Examination of the Metric
The Green Grid · Victor Avelar, Dan Azevedo et al.
The Green Grid's consolidated reference on PUE (WP 49, 2012), superseding its earlier PUE papers and covering definition, measurement levels, partial PUE and reporting conventions.
On this page
Overview
The document is The Green Grid's consolidated reference on Power Usage Effectiveness (PUE) and supersedes its earlier PUE papers. It covers the definition, measurement levels and points, mixed-use and specialized facilities, reporting conventions, partial PUE and the treatment of reused energy. The full text requires sign-in (it is also sold as a book through ASHRAE); this page relies on public summaries only.
PUE is total facility energy divided by IT equipment energy, preferably computed on annual energy (kWh) rather than instantaneous power; DCiE is the inverse of PUE, expressed as a percentage. There are three measurement levels: Level 1 basic (IT measured at UPS output), Level 2 intermediate (at PDU output) and Level 3 advanced (at IT equipment input), with measurement frequency rising with the level.
Partial PUE (pPUE) is the sum of a zone's IT energy and infrastructure energy divided by that zone's IT energy, used for containers or sub-systems. The document's stated limit is that PUE measures infrastructure overhead, not IT efficiency or productivity, and it is not a stand-alone comprehensive efficiency metric.
Key points
- PUE = total facility energy / IT equipment energy, preferably annual energy (kWh) rather than instantaneous power.
- DCiE = 1/PUE (as a percentage).
- Level 1: IT at UPS output; Level 2: at PDU output; Level 3: at IT equipment input.
- Measurement frequency increases with the level.
- pPUE = (zone IT energy + zone infrastructure energy) / zone IT energy.
- PUE is not a productivity metric nor a stand-alone comprehensive efficiency metric.
Using it in design
- Make the default PUE output an annual energy-based PUE from an hourly (8760) simulation, labelled with its measurement level (design estimate: 'L3-equivalent model').
- Provide pPUE per hall or zone and DCiE as a secondary display.
- Never present peak-power PUE as annual PUE; label instantaneous values clearly.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.
Request a demo
Who should read it
Design engineers and operations teams who calculate or report PUE.
Related standards
- ISO/IEC 30134-2
- EN 50600-4-2
- ASHRAE Datacom Series: PUE
Publication details
- Authors
- Victor Avelar; Dan Azevedo; Alan French
- Publisher
- The Green Grid
- Year
- 2012
- Document number
- WP 49
- Document language
- English
- Source type
- Industry body
- Access
- Citation only
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Victor Avelar; Dan Azevedo; Alan French (2012). WP#49 - PUE: A Comprehensive Examination of the Metric. The Green Grid. WP 49. https://www.thegreengrid.org/en/resources/library-and-tools/237-WP%2349---PUE%3A-A-Comprehensive-Examination-of-the-Metric
Events on this subject
- iMasons Climate Accord Summit
- Data Center World Middle East
- ELECO 2026 Elektrik-Elektronik ve Biyomedikal Mühendisliği Konferansı
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.