Datacloud Africa
About the event
Nairobi conference co-located with ITW Africa on data centre and cloud infrastructure investment across Africa, aimed at operators, developers and investors in the African market.
Who it is for / why attend
For operators, energy providers and investors developing projects in Africa. The programme focuses on power, scalability and bankable projects, with a Digital Infrastructure Investment Day and an Energy Summit; it is co-located with ITW Africa.
Venue
Dates and details are compiled from official organiser sources. Check the official website for the programme, admission requirements and registration status before making plans.
Read before you go
Go to the libraryInterface Specification Between Hyperscalers and Utility Grid for Disturbance Performance (Version 1.0.0)
Open Compute Project Foundation, 2026, Guide or technical publication
This OCP base specification, authored by Google, Meta, Microsoft and NVIDIA, proposes a common voltage ride-through envelope and post-fault active power recovery requirement so that large data centre…
Guide or technical publication
2026
FEMA P-1019, Emergency Power Systems for Critical Facilities: A Best Practices Approach to Improving Reliability (September 2014)
FEMA, 2014, Guide or technical publication
A FEMA best-practice guide prepared by the Applied Technology Council on making emergency and standby power systems in critical facilities survive and operate through winter storms, high winds, flood…
Guide or technical publication
2014
Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems
arXiv, 2026, Research paper
A preprint showing how the internal power-conditioning chain of a data centre, during a grid fault, limits the total capacity that can be connected and how that capacity is spread across buses.
Research paper
2026
Cost studies in SoSo CAD
Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.
