Datacloud USA
About the event
Austin conference co-located with Metro Connect Fall and Datacloud Energy USA on US data centre development, power procurement and finance, aimed at developers, operators and investors.
Who it is for / why attend
For senior executives and investors developing US data centres. Previous-edition themes were power constraints, cooling vs rack density, permitting and capital; forums include Nuclear for AI and Investment & Finance.
Venue
Dates and details are compiled from official organiser sources. Check the official website for the programme, admission requirements and registration status before making plans.
Read before you go
Go to the libraryNext-Generation Medium-Voltage Architecture for AI Data Centers
ABB, 2026, Vendor publication
An ABB paper arguing that conventional low-voltage UPS topologies scale poorly for 200-500 MW AI campuses, and proposing medium-voltage distribution with MV UPS and battery energy storage (BESS) work…
Vendor publication
2026
Reference Design #505: Eaton 1 GW Power Architecture Meets Trane Thermal Management
Eaton / Trane, 2025, Vendor publication
A joint Eaton-Trane paper describing a gigawatt-scale AI campus built from roughly 100 MW compute blocks, with medium-voltage distribution, 800 V DC rack power and very large CDU capacities.
Vendor publication
2025
Totally Integrated Power - Application Models for Power Distribution: Data Centres
Siemens, 2013, Vendor publication
This 80-page Siemens planning manual from 2013 walks the whole electrical chain of a data centre, from medium voltage to sub-distribution. Its Tier IV worked example is especially useful because it…
Vendor publication
2013
Cost studies in SoSo CAD
Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.
