The paper argues that low-voltage UPS architecture does not scale for 200-500 MW AI campuses and proposes moving to medium-voltage distribution, typically 6-35 kV. The target for an MV UPS is system efficiency above 98% and response in under 2 ms to grid disturbances. The UPS handles fast transients while BESS takes longer-duration support, peak shaving and microgrid functions.
The grid-code section summarises conditions large loads now face: ride-through of dips down to 0% for 200-300 ms and of repeated dips (for example 10 within 90 s); frequency tolerance typically 47.5-52 Hz in Europe and +/-2 Hz in Asia; RoCoF up to 3 Hz/s and phase jumps up to +/-30 degrees. After a fault, active power must recover to at least 90% within 0.5 s, with power factor >=0.99 and reactive support.
In the components section BESS blocks span 0.6-21.6 MW with 1, 2 or 4 hour durations. MV redundancy variants are shown as distributed redundant, 2N and N+1. The paper ties the architecture to 24/7 carbon-free operation through a microgrid approach, treating load, storage and generation under one control framework. It is a vendor article describing ABB's own approach and dates from 2026; the comparison figures are not independently verified. Grid-code examples vary by country, so a given project must use its own grid operator's requirements; the paper's value is in listing which topics need to be checked.
Key points
- MV distribution typically 6-35 kV for AI campuses of 200-500 MW
- MV UPS target >98% system efficiency and <2 ms response to grid disturbances
- Grid-code examples: ride through dips to 0% for 200-300 ms, repeated dips (e.g. 10 within 90 s)
- Frequency tolerance typically 47.5-52 Hz (Europe), +/-2 Hz (Asia); RoCoF up to 3 Hz/s; phase jump up to +/-30 deg
- Post-fault active power recovery >=90% within 0.5 s; PF >=0.99 / VAR support
- BESS blocks 0.6-21.6 MW with 1, 2 or 4 h durations
- Redundancy variants: distributed redundant, 2N, N+1
Using it in design
- For loads above roughly 30–50 MW, compare LV-UPS and MV-UPS architectures. Include LVRT duration, frequency band, RoCoF and power factor in the grid-code assessment.
- Add MV UPS (efficiency 98%+) and BESS (MW, MWh, duration 1/2/4 h) to the catalog.
- BESS energy calculation: energy = P x duration / DoD.
- Compare distributed redundant, 2N and N+1 MV architectures by cost and availability.
Who should read it
Electrical designers and project decision makers choosing grid connection and UPS architecture for AI campuses of hundreds of MW.
Related standards
- IEC 62040-3
- IEC 62271
- EN 50549 / grid codes
- IEEE 2800
- EN 50600-2-2
Publication details
- Authors
- ABB
- Publisher
- ABB
- Year
- 2026
- Document number
- 9AKK108472A2558
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
ABB (2026). Next-Generation Medium-Voltage Architecture for AI Data Centers. ABB. 9AKK108472A2558. https://library.e.abb.com/public/779d55d86bbd41a1b5913c9ac56c8013/9AKK108472A2558_en_B_Next-Generation%20Medium-Voltage%20Architecture%20for%20AI%20Data%20Centers.pdf