ABB BuyLog section 19 (October 2023): the 50-800 kVA TruFit PDU for the UL market and the 100-4000 A, 208-600 V Cyberex SuperSwitch4 static transfer switch, with in-phase transfer under a quarter cycle.

On this page

Overview

The section is ABB's selection catalogue for power distribution units (PDU) and static transfer switches (STS), updated October 2023. The TruFit PDU covers 50 to 800 kVA for the UL market and uses a high-efficiency transformer, integrated monitoring, front-only access and ABB SACE Tmax XT breakers. The main cabinet is 42 x 36 x 78 in and up to 2650 lb for 50-300 kVA, and 60 x 48 x 84 in and up to 5500 lb for 400-800 kVA. Primary is 480 Vac three-phase, secondary 208/120 Vac (50-300 kVA) or 415/240 and 208/120 Vac (400-800 kVA); frequency 60 Hz ±5%, efficiency DOE 2016 compliant, K4 standard (K13, K20 optional), ETL listed to UL 891.

The PowerView monitoring system has two tiers: Core (±2% accuracy, harmonics to the 9th order) and Pro (±1%, harmonics to the 35th order, waveform capture, NTP time sync, optional breaker status and thermal monitoring). Up to six 42-circuit panelboards (252 circuits) and up to 65 three-wire or 60 four-wire sub-feed breakers can be monitored; Modbus RTU and Modbus TCP are standard. For 400-800 kVA, optional 100 or 200 kA SPDs and seismic under-floor stands are offered.

The Cyberex SuperSwitch4 STS comes in 3-pole models of 200, 250, 400, 600, 800, 1000, 1200, 1600, 2000, 3000 and 4000 A, 208-600 V, 50/60 Hz, and 4-pole models (SCR-based neutral switching) of 200-800 A, 208-415 V, 60 Hz. In-phase transfer is under 4 ms (a quarter cycle), out-of-phase transfer under 15-16 ms, and downstream transformer inrush below 1.2x nominal. Full-load efficiency is up to 99.4% at 480 V and 98.7% at 208 V; overload is 125% for 30 min, 150% for 1 min and 200% for 10 s; MTBDE is 1.5 million hours and short-circuit rating 65 or 100 kAIC.

Key points

  1. TruFit PDU: 50, 75, 125, 150, 225, 300 kVA and 400, 500, 600, 750, 800 kVA; 480 Vac primary.
  2. Main cabinet: 42x36x78 in, ≤2650 lb for 50-300 kVA; 60x48x84 in, ≤5500 lb for 400-800 kVA.
  3. Front-only access; ETL UL 891; DOE 2016 efficiency; K4 standard.
  4. PowerView Core ±2%, 9th harmonic; Pro ±1%, 35th harmonic; panel monitoring up to 252 circuits.
  5. SuperSwitch4 3-pole: 200-4000 A, 208-600 V; 4-pole: 200-800 A, 208-415 V.
  6. In-phase transfer <4 ms; out-of-phase <15-16 ms; inrush <1.2x.
  7. Full-load efficiency up to 99.4% at 480 V and 98.7% at 208 V.
  8. Overload: 125% 30 min, 150% 1 min, 200% 10 s, 1000% 3 cycles; SCCR 65 or 100 kAIC.
  9. MTBDE 1.5 million hours; operating 0 to 40 °C.

Using it in design

  • In 60 Hz, 480 V UL systems, carry PDU size and weight (2650 or 5500 lb) into data-hall floor loading.
  • Plan layouts for front-only access that need no side or rear service clearance.
  • Select PowerView Core or Pro by monitoring need; require Pro if harmonic analysis to the 35th order is needed.
  • Choose STS current from load and the 125% for 30 min overload curve; compare the SCCR with the short-circuit study.
  • Consider the 4-pole STS to limit circulating neutral current in separately derived systems.

Who should read it

Electrical engineers and specifiers selecting data-centre PDU and STS equipment for UL/ANSI markets.

Document contents

  1. TruFit PDU 50-800 kVA overview
  2. Technical specifications 50-300 kVA and 400-800 kVA
  3. PowerView monitoring system
  4. Cyberex SuperSwitch4 product overview
  5. 3-pole and 4-pole offerings
  6. 3-pole technical specifications 200A-4000A
  7. 4-pole technical specifications 200A-800A
  8. Ordering information

Publication details

Authors
ABB
Publisher
ABB
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

ABB BuyLog Section 19: PDU and STS. ABB. https://library.e.abb.com/public/06ea9f8dd9f84ca4b8b19e9e3fd35b12/19_BuyLog_PDUandSTS.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.