Technical guideFree to read2024

ABB TruONE ATS Catalogue (1SXF230007C0201, 16.10.2024)

Original title TruONE ATS catalogue

ABB

An ABB catalogue for the TruONE automatic transfer switch family, which integrates the controller with the switch in one unit, giving type codes, IEC and UL operational ratings, withstand values, standards, accessories and dimension drawings.

On this page

Overview

The catalogue presents TruONE ATS as a modular ATS in which switch and controller are integrated in one unit, reducing secondary wires and module plugs. The manufacturer says that assembling an ATS from components and as many as 20 connection wires is avoided, and only main circuit wiring and a standard housing are needed. Highlighted features: emergency manual operation under load without opening the door, a detachable HMI, no dangerous line voltage brought to the door, predictive maintenance and self-diagnostics, seven communication protocols, ABB Ability EAM Energy and Asset Manager compatibility and automatic commissioning by uploading premade configuration files.

The technical data table gives five frame sizes: 250, 400, 800, 1600 and 4000 (R5). IEC rated operational currents run from 200 to 4000 A (200, 250, 315, 400, 500, 630, 800, 1000, 1250, 1600, 2000, 2500, 3200, 4000 A), while UL ratings from 30 to 3000 A (30, 60, 100, 125, 160, 200, 260, 400, 600, 800, 1000, 1200, 1600, 2000, 2600, 3000 A) are listed separately. Products at 1250 A and below operate over a wide 200-480 VAC range, and 1600-4000 A (R5) is for 380/400/415 V. Poles are 3 or 4, and for 1600-4000 A the N pole is a break-last, make-first solution.

Withstand values are per frame: Icw 18/0.3 kA/s (250 frame), 25/0.3 (400), 42/0.1 and 30/0.3-0.5 (800), 50/0.5 (1600) and 100/0.06, 85/1, 65/3 (4000 R5); conditional short-circuit current is 100 kA with fuse protection (200 kA for 4000 R5) and 50 kA with breaker protection (85 kA for the 1600 frame). Contact transfer time is below 50 ms for all frames. Insulation voltage Ui is 1000 V (1250 V for 4000 R5) and impulse withstand voltage is 8 to 12 kV. The type code separates transition type: A open transition, B delayed (with stable OFF position) and C closed transition (for 1600-4000 A R5). Controller levels are 2 (dial), 3 (LCD) and 4 (touch screen).

Operating conditions are minus 25 to plus 70 degrees C, altitude up to 2000 m, pollution degree 3, IP20 and IBC2015 1705.13 seismic resistance. The catalogue cites IEC 60947-6-1, UL 1008 and GB standards and EMC immunity and emission tests. Because the document lists IEC and UL ratings separately, a frame's withstand and enclosure requirements depend on the chosen frame size; values of different frames should not be carried across.

Key points

  1. Frame sizes: 250, 400, 800, 1600 and 4000 (R5); IEC ratings 200-4000 A and UL ratings 30-3000 A are listed separately.
  2. Products at 1250 A and below operate at 200-480 VAC; 1600-4000 A (R5) products are for 380/400/415 V; 50/60 Hz.
  3. 3 or 4 poles; 4-pole with overlapping neutral for UL; at 1600-4000 A the N pole is break-last, make-first.
  4. Transition type in the type code: A open, B delayed (stable OFF), C closed (1600-4000 A R5).
  5. Contact transfer time is below 50 ms for all frames.
  6. Icw: 18/0.3 kA/s (250 frame), 25/0.3 (400), 42/0.1 and 30/0.3 (800), 50/0.5 (1600), 100/0.06, 85/1, 65/3 (4000 R5).
  7. Conditional short-circuit current: 100 kA with fuse protection (200 kA at 4000 R5), 50 kA with breaker protection (85 kA for the 1600 frame).
  8. Weight 3P/4P: 14/15.6 kg (250 frame), 15.4/17.5 (400), 19.1/21.4 (800), 31.1/37.1 (1600), 203/223 kg (4000 R5).
  9. Operating temperature minus 25 to plus 70 degrees C; altitude up to 2000 m; IP20; seismic IBC2015 1705.13; controller levels 2, 3 and 4.

Using it in design

  • When selecting an ATS, use the IEC and UL rating lists separately and match the frame size (250, 400, 800, 1600, 4000 R5) to withstand and enclosure requirements; do not carry one frame's values to another.
  • Determine transition type from the type code: for a data centre, closed transition exists only on the 1600-4000 A R5 frame; at smaller ratings choose open or delayed transition.
  • Compare the available short-circuit current from the fault study with Icw and conditional short-circuit current per frame; read fuse-protected and breaker-protected values separately.
  • Plan enclosure size per frame (for example at least 600 x 800 x 300 mm for the 250-800 frames, 800 x 1000 x 300 mm for 1600, 910 x 1426 x 600 mm for 4000 R5) and add terminal bolt size and torque to the installation procedure.
  • State in the voltage specification that the 200-480 VAC range applies only to 1250 A and below and that above 1600 A it is 380-415 V.

Who should read it

Electrical engineers and panel builders selecting ATS equipment for data centres and critical facilities.

Document contents

  1. TruONE ATS
  2. Advantages
  3. Product structure
  4. Type designation
  5. Technical data
  6. Features
  7. Accessories
  8. Electrical wiring diagram
  9. Dimension drawings
  10. Dimensions and installation of TruCONTROL
  11. HMI installation

Publication details

Authors
ABB
Publisher
ABB
Year
2024
Document number
1SXF230007C0201
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

ABB (2024). TruONE ATS catalogue. ABB. 1SXF230007C0201. https://library.e.abb.com/public/e147d82ddfe141b4b4e94e8893b383b6/TruONE_standard_ATS_Catalogue_EN_1SXF230007C0201_20241016.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.