Can STATCOM and UPS-Based Voltage Support Mitigate Fault-Induced Reductions in AI Data Center Grid Power Draw?
arXiv · Ziang Liu, Yimeng Liu et al.
A preprint (arXiv, 12 November 2026) comparing reactive support from STATCOM and UPS rectifiers during voltage sags using electromagnetic-transient (EMT) simulations. It uses a model of a 1 GW AI data centre connected to an IEEE nine-bus system, and is a source for fault ride-through and grid-impact questions in data-centre electrical design.
On this page
Overview
The paper notes that AI data centres are large loads interfaced through power electronics and can sharply cut the power they draw from the grid during fault-induced voltage sags, and that disturbances beyond equipment ride-through capability may also trigger protective disconnection, posing risks to system security. A central concept is momentary cessation (MC), a protective converter response in which current exchange is temporarily suspended during a sag. In the UPS studied, MC blocks the rectifier bridge while the battery and DC link keep supplying the IT load; MC reset and current walk-in can prolong reduced grid draw beyond the sag.
The study connects a 1 GW PNNL data-centre model to an IEEE nine-bus system at Bus 8 in PSCAD/EMTDC, with a STATCOM in parallel through a separate 230/25 kV transformer. The data-centre model aggregates 1050 UPS units, each at a 1 MVA base and a 1.2 kV DC link. MC engages when the local phase-RMS voltage stays below 0.7 pu for 10 ms and resets when local voltage exceeds 0.9 pu for 50 ms; the native current walk-in setting is 4 s.
Three auxiliary branches have 0.75 pu and 50 ms undervoltage protection with latched trips and no reclosing. The STATCOM is rated 300 Mvar. The UPS strategy uses a fixed active power reference of 0.20 MW per unit during voltage support (internal demand about 0.647 MW) and allocates the remaining current capacity to capacitive reactive support.
Four configurations are compared: A baseline UPS control, B STATCOM, C coordinated UPS control and D combined support. Three-phase ground faults are applied at near (line 7-8) and remote (line 4-5) locations for 100, 150 and 200 ms. Findings: for 100 ms faults the STATCOM avoids MC in the near case, but not in a remote case with a similar uncompensated PCC voltage, where local rectifier voltage stays below 0.7 pu for 13.8 ms. UPS coordination extends the MC-avoidance range to deeper near faults. At 2.315 ohm and 100 ms, both coordinated configurations avoid MC but only combined support keeps all three auxiliary branches, and late facility demand reaches 993.39 MW against 722.65 MW with UPS coordination alone.
In the milder 3.03 ohm fault, STATCOM alone keeps minimum facility grid draw at 696.08 MW with only 7.159 MJ of battery discharge; UPS coordination lowers minimum demand to about 400 MW but retains the auxiliary loads and restores demand above 90% of its prefault value within 0.394 s. For the 200 ms fault, combined support reduces full-event battery discharge from 293.549 MJ to 193.705 MJ (a 34.01% reduction) and advances sustained 90% recovery from 0.7873 s to 0.5528 s. In sufficiently deep sags (about 0.5 and 0.3 pu), MC still occurs for 149.3 and 394.7 ms even with combined support, minimum facility demand falls to 3.53 and 1.26 MW and all auxiliary branches trip. Facility disconnection, ride-through compliance and system frequency consequences are outside the scope.
Key points
- Model: a 1 GW data centre (1050 UPS units, 1 MVA each) connected to an IEEE nine-bus system at Bus 8; STATCOM of 300 Mvar.
- MC engages when local phase-RMS voltage stays below 0.7 pu for 10 ms and resets when local voltage exceeds 0.9 pu for 50 ms; native current walk-in is 4 s.
- UPS coordination support starts when voltage falls below 0.85 pu for 2 ms and ends when it exceeds 0.92 pu for 20 ms; a fixed 0.20 MW active power reference per unit is used.
- The STATCOM avoids MC in a near fault; in a remote fault with a similar uncompensated PCC voltage, local voltage stays below 0.7 pu for 13.8 ms and MC is not avoided.
- Near fault at 2.315 ohm: only combined support keeps all auxiliary branches; late facility demand 993.39 MW against 722.65 MW with UPS coordination alone.
- Mild fault (3.03 ohm): STATCOM keeps minimum facility draw at 696.08 MW; UPS coordination lowers demand to about 400 MW but restores 90% within 0.394 s.
- For a 200 ms fault, combined support cuts battery discharge by 34.01% (293.549 MJ to 193.705 MJ) and moves sustained 90% recovery from 0.7873 s to 0.5528 s.
- In sags of about 0.5 and 0.3 pu, MC lasts 149.3 and 394.7 ms even with combined support; minimum facility demand falls to 3.53 and 1.26 MW and all auxiliary branches trip.
- The benefit of voltage support depends on fault severity and recovery dynamics and does not increase monotonically with added support.
Using it in design
- In the grid-connection study of a large AI data centre, ask the supplier for the UPS rectifier's momentary-cessation threshold, duration, reset and current walk-in settings and tie them to the expected drop in grid draw during a fault.
- Design auxiliary-load protections (undervoltage threshold, trip time and latched trips) together with UPS ride-through: in the paper, auxiliary trips directly limit recovery of facility demand.
- Treat STATCOM and UPS-based reactive support as separate resources: the STATCOM preserves short-term draw in milder faults while UPS coordination keeps the rectifier operating in deeper sags; choose according to expected fault severity at the connection point and the recovery target.
- Size the UPS battery discharge envelope (for example 1 MW continuous per unit, a limit above 1.5 MW for 2 ms and a 600 MJ energy budget) together with the support strategy.
- For very deep voltage sags (about 0.5 pu and below), expect large drops in draw even with combined support; discuss facility behaviour and recovery expectations with the grid operator early.
Who should read it
Electrical and grid-connection designers of large data centres, UPS and STATCOM manufacturers, power-system simulation analysts and grid operators.
Document contents
- Introduction (AI data centres, momentary cessation, voltage-support approaches)
- System Modeling and Voltage Support (study system and power paths, STATCOM and UPS coordination, study design and performance measures)
- Simulation Results and Discussion (MC avoidance, auxiliary-load retention and facility recovery, fault duration and postfault recovery dynamics, performance limits under deep voltage sags)
- Conclusion
Publication details
- Authors
- Ziang Liu; Yimeng Liu; Francis Yunhe Hou
- Publisher
- arXiv
- Year
- 2026
- Document number
- arXiv:2611.16569v1
- Document language
- English
- Source type
- Scientific
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
arXiv record links its non-exclusive distribution license; this grants arXiv hosting rights, not general commercial redistribution. Citation and original brief summary only.
Citation
Ziang Liu; Yimeng Liu; Francis Yunhe Hou (2026). Can STATCOM and UPS-Based Voltage Support Mitigate Fault-Induced Reductions in AI Data Center Grid Power Draw?. arXiv. arXiv:2611.16569v1. https://doi.org/10.48550/arXiv.2611.16569
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.