The NABERS programme separates measured operational ratings from commitments for new projects and offers two energy rating types: Infrastructure and Whole facility.

On this page

Overview

The NABERS Data Centres programme guide distinguishes measured operational ratings of existing facilities from commitments for new projects. It explains infrastructure and whole-facility assessment, renewable-energy transparency and the role of supporting operational records.

The current page lists two energy rating types: Infrastructure and Whole facility. A Commitment Agreement concerns designing, building and commissioning to a targeted rating; it is distinct from the measured rating of an existing facility.

Key points

  1. The programme separates measured operational ratings from commitments for new projects.
  2. The current energy rating types are Infrastructure and Whole facility.
  3. A Commitment Agreement covers designing, building and commissioning to a targeted rating.
  4. A Commitment Agreement is distinct from the measured rating of an existing facility.
  5. The guide addresses renewable-energy transparency and supporting operational records.

Using it in design

  • On a new project, bind the target rating at design stage through a Commitment Agreement and plan for verification by commissioning and operating measurement.
  • Reflect the Infrastructure and Whole facility rating boundaries in the design of metering points.
  • Make the supporting operational records (meter and energy data) collectable from the start for the rating application.

Who should read it

Owners and design teams in Australia who set a rating target for a new data centre or want to rate an existing one.

Publication details

Authors
NABERS
Publisher
NABERS
Year
Year not stated
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official public publisher text inspected. No document-specific commercial redistribution permission established; metadata and original short summaries only.

Citation

NABERS NABERS Data Centres: ratings and tools. NABERS. https://www.nabers.gov.au/ratings/spaces-we-rate/data-centres

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.