Recommendation ITU-T L.1302 (11/2015): Assessment of energy efficiency on infrastructure in data centres and telecom centres
International Telecommunication Union (ITU-T) · ITU-T Study Group 5
ITU-T L.1302 (2015) gives the method for calculating an operating data centre's PUE, pPUE, power-feeding efficiency and cooling CLF, using a 12-month assessment, measurement at least every 30 minutes and defined measurement points.
On this page
Overview
L.1302 specifies how to assess the infrastructure energy efficiency of data and telecom centres under running conditions. The scope covers four assessments: the whole facility, a part of it (for example one room), the power feeding system and the cooling system. Because power feeding and cooling are the main energy-consuming infrastructure, each gets its own methodology. It is the first edition, dated 2015, and refers to L.1300, L.1320 and the L.1200 series.
Test instrument accuracy for the whole facility is: temperature ±0.5 degrees C, humidity ±5%, voltage and current ±1%, power ±3% and energy IEC 62053-21 class 1. The assessment period is twelve months, because cooling efficiency varies with outdoor temperature and power efficiency with load rate; any other period must be justified in the report. Energy must be measured continuously and at least every 30 minutes. Discontinuous measurement needs assessment at least hourly, twice a day and on at least three days a month, covering busy and idle hours and all seasons.
PUE is total facility energy over IT energy, with IT energy measured at the IT equipment input terminals. For a high- or medium-voltage-fed facility, total energy is the sum of four measurement points; for a low-voltage-fed facility the transformer efficiency is included. For a partial facility, pPUE is the energy within a defined boundary over IT energy; where the outdoor cooling plant is shared in a large facility, cooling-tower energy is allocated by the ratio of the room's rated cooling capacity to the whole facility's.
Power-feeding efficiency is IT energy over system input energy, and the power load factor PLF is power losses over IT energy. Because online EER is hard to measure, CLF (cooling energy over IT energy) is recommended instead, with pCLF for partial facilities. The recommendation points to L.1320 for equipment-level measurement and requires clamp-on voltage and current probes so measurement does not disturb operation, with meters installed after the facility is in operation.
Key points
- Edition 1.0, approved 29 November 2015; a 22-page recommendation covering data and telecom centres.
- The assessment period is twelve months; any other period is justified in the report.
- Energy is measured continuously and at least every 30 minutes; discontinuous measurement needs at least hourly assessment, twice a day, on at least three days a month.
- Instrument accuracy: temperature ±0.5 degrees C, humidity ±5%, voltage and current ±1%, power ±3%, energy IEC 62053-21 class 1.
- PUE = EDC/EIT; EIT is measured at IT equipment input terminals, or calculated from EAR times PDU efficiency if direct measurement is impracticable.
- For HV/MV-fed facilities EDC is the sum of four measurement points; for LV input the transformer efficiency is applied.
- pPUE = EpDC/EIT; a shared cooling outdoor unit is allocated by the room's rated cooling capacity over the whole facility's.
- Power-feeding efficiency is EIT/Einput_power and PLF = (Einput_power - EIT)/EIT; with a second source such as renewables, source shares and efficiencies enter the calculation.
- For cooling, CLF = Ec/EIT is recommended instead of EER, and pCLF = Epc/EIT for partial facilities.
Using it in design
- At design stage, define the PUE, pPUE and CLF measurement points (IT input terminals, main distribution, cooling board) on the metering schedule and single-line diagram.
- Write the 12-month assessment, 30-minute logging interval and busy/idle and seasonal coverage into the acceptance and operational verification plan.
- Use the L.1302 accuracy classes (energy class 1, power ±3%, temperature ±0.5 degrees C) as a floor in meter specifications.
- For multi-room facilities or a shared cooling tower, decide between the rated-capacity share method and a separate tower meter for pPUE.
- If a renewable or second energy source exists, define in the methodology how input energy is computed from source share and efficiency.
Who should read it
Electrical and mechanical designers writing measurement and verification plans, commissioning and operations teams, and operators reporting PUE.
Document contents
- Scope
- References
- Definitions
- Abbreviations and acronyms
- Architecture of data centre or telecom centre energy consumption
- Whole data centre and telecom centre energy efficiency measurement methodology (test instrument, assessment period and frequency, conditions, measurement methods, measurement points and calculation, partial facility)
- Power feeding system energy efficiency measurement methodology
- Cooling system energy efficiency measurement methodology
Related standards
- ISO/IEC 30134-2
- ITU-T L.1301
Publication details
- Authors
- ITU-T Study Group 5
- Publisher
- International Telecommunication Union (ITU-T)
- Year
- 2015
- Document number
- ITU-T L.1302 (11/2015)
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
ITU Recommendation, (c) ITU, all rights reserved; English PDF downloadable free of charge.