NABERS Energy for Data Centres Rules, Version 2.0
NABERS
NABERS's April 2024 rules version 2.0 define the operational rating for Australian data centres; they supersede the 2014 v1.1 rules and distinguish Infrastructure, IT equipment and Whole facility scopes.
On this page
Overview
The NABERS Energy for Data Centres Rules version 2.0 are the operational rating rules for data centres in Australia and are dated April 2024. The version supersedes the 2014 v1.1 rules. The rules cover processing and storage capacity, energy coverage, consumption evidence and metering.
The rules distinguish three scopes: Infrastructure, IT equipment and Whole facility. In a conflict, later rulings take precedence. Version 2.0 describes three scopes; the current programme overview lists two rating types, so the scopes for which assessment is offered should be confirmed separately with NABERS.
Key points
- Version 2.0 is dated April 2024 and supersedes the 2014 v1.1 rules.
- The rules cover processing and storage capacity, energy coverage, consumption and metering.
- Three scopes are defined: Infrastructure, IT equipment and Whole facility.
- In a conflict, later rulings take precedence.
- The programme overview lists two rating types.
Using it in design
- Settle with NABERS at the start of design which scope (Infrastructure, IT equipment, Whole facility) applies to the rating target.
- Design the metering architecture (sub-meters, IT and infrastructure split) that defines the energy coverage and boundary according to the rules.
- Add the metering records and period needed as consumption evidence to the operating plan.
Who should read it
Engineers and operators designing data centres or seeking a rating in Australia.
Publication details
- Authors
- NABERS
- Publisher
- NABERS
- Year
- 2024
- Document number
- Version 2.0, April 2024
- Document language
- English
- Source type
- Government / public
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official 80-page PDF opened with web PDF extraction after curl HTTP/2 failure and HTTP/1.1 timeout. Copyright NSW Government 2024, PDF p.2. No redistribution licence established. The programme overview currently lists two energy-rating types while this rules edition includes three scopes; applicability must be confirmed with NABERS.
Citation
NABERS (2024). NABERS Energy for Data Centres Rules, Version 2.0. NABERS. Version 2.0, April 2024. https://www.nabers.gov.au/sites/default/files/2024-04/NABERS%20Rules%20-%20Energy%20for%20Data%20Centres%20v2.0.pdf