Technical guideFree to read2024

NABERS Energy for Data Centres Rules, Version 2.0

NABERS

NABERS's April 2024 rules version 2.0 define the operational rating for Australian data centres; they supersede the 2014 v1.1 rules and distinguish Infrastructure, IT equipment and Whole facility scopes.

On this page

Overview

The NABERS Energy for Data Centres Rules version 2.0 are the operational rating rules for data centres in Australia and are dated April 2024. The version supersedes the 2014 v1.1 rules. The rules cover processing and storage capacity, energy coverage, consumption evidence and metering.

The rules distinguish three scopes: Infrastructure, IT equipment and Whole facility. In a conflict, later rulings take precedence. Version 2.0 describes three scopes; the current programme overview lists two rating types, so the scopes for which assessment is offered should be confirmed separately with NABERS.

Key points

  1. Version 2.0 is dated April 2024 and supersedes the 2014 v1.1 rules.
  2. The rules cover processing and storage capacity, energy coverage, consumption and metering.
  3. Three scopes are defined: Infrastructure, IT equipment and Whole facility.
  4. In a conflict, later rulings take precedence.
  5. The programme overview lists two rating types.

Using it in design

  • Settle with NABERS at the start of design which scope (Infrastructure, IT equipment, Whole facility) applies to the rating target.
  • Design the metering architecture (sub-meters, IT and infrastructure split) that defines the energy coverage and boundary according to the rules.
  • Add the metering records and period needed as consumption evidence to the operating plan.

Who should read it

Engineers and operators designing data centres or seeking a rating in Australia.

Publication details

Authors
NABERS
Publisher
NABERS
Year
2024
Document number
Version 2.0, April 2024
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Official 80-page PDF opened with web PDF extraction after curl HTTP/2 failure and HTTP/1.1 timeout. Copyright NSW Government 2024, PDF p.2. No redistribution licence established. The programme overview currently lists two energy-rating types while this rules edition includes three scopes; applicability must be confirmed with NABERS.

Citation

NABERS (2024). NABERS Energy for Data Centres Rules, Version 2.0. NABERS. Version 2.0, April 2024. https://www.nabers.gov.au/sites/default/files/2024-04/NABERS%20Rules%20-%20Energy%20for%20Data%20Centres%20v2.0.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace