Technical guideFree to read2015

Recommendation ITU-T L.1301 (05/2015): Minimum data set and communication interface requirements for data centre energy management

International Telecommunication Union (ITU-T) · ITU-T Study Group 5

ITU-T L.1301 (2015) defines the minimum static and dynamic data set to collect from ICT and facility equipment for data-centre energy management; suggested power measurement accuracy is ±2%.

On this page

Overview

L.1301 establishes the minimum data set needed to manage data centres in an environmentally responsible way, and high-level interface requirements for how ICT and facility equipment communicate with a management system. The architecture has two parts: managed entities (ICT and facility equipment) and the management system. Equipment sends information as static data once and energy-related measurements as dynamic data periodically, and the management system can send control data back.

Managed entities are server, storage and networking equipment (ICT) and power-feeding and cooling systems (facility). Power covers generator, rectifier, UPS, battery, PDU and AC/DC converters; cooling covers chiller, cooling tower, economizer, CRAC, modular cooling, humidifier and outdoor-air systems. The minimum static data is equipment ID and description, operating temperature range for ICT, energy consumption characteristics and temperature setting range for cooling, and total capacity, battery string count and efficiency characteristics for power.

The minimum dynamic data are values to get (G) from or set (S) on equipment: for ICT, input power, inlet temperature and power state; for cooling, supply, return and outdoor air temperature, temperature setting, relative humidity, power and energy consumption and fan speed; for power, input and output power, voltage, current, battery voltage and current, total harmonic distortion and power factor. Measured parameters must carry a vendor-independent common name or ID.

The appendices are optional and not part of the standard: extra data examples for a cloud data centre, use cases (hot and cold spot detection, coordinated control of multiple cooling units), suggested measurement accuracies and related work in ETSI, ECMA and IETF. The document imposes no particular protocol; it defines the data set and interface requirements only.

Key points

  1. Edition 1.0, approved 7 May 2015, 21 pages.
  2. Static data is constant information (specification, configuration, location); dynamic data is operating data obtained periodically from equipment.
  3. For ICT equipment, inlet temperature and input power are mandatory measurement parameters; power state (off, sleep, active) is also in the dynamic set.
  4. For cooling equipment the set takes supply, return and outdoor air temperature, relative humidity, power and energy consumption; temperature setting and fan speed can optionally be written.
  5. For power equipment the set takes input and output power, voltage, current, battery voltage and charge/discharge current and power factor; harmonic distortion is optional.
  6. Parameters must have a vendor-independent common name or ID, and equipment must be uniquely identifiable in a multivendor environment.
  7. Suggested accuracy: ICT input power 3% at 25 to 100% load and 5% below 25%; inlet temperature 1 degree C in the 20 to 50 degrees C range.
  8. For cooling equipment, air temperature ±0.5 degrees C (20 to 50 degrees C), relative humidity ±5%, power and energy ±2%; for power equipment voltage ±1%, AC current ±1%, DC current ±5%.
  9. No single measurement interval is given; in the example a 30-second measurement may be averaged over 5 minutes or 1 hour in the management system.

Using it in design

  • Derive the monitoring point list from the static and dynamic items in Tables 2 and 3, and write the minimum items for each equipment type into the BMS/DCIM specification.
  • Make ICT inlet temperature and input power measurable at rack or device level; hot and cold spot detection and better CRAC operation depend on these data.
  • Use the suggested accuracies (±2% for power and energy, ±0.5 degrees C for air temperature) as a starting point in sensor and meter specifications.
  • For multivendor equipment, put common naming and IDs, unique equipment identification and data-integrity checks into the integration contract.
  • In halls with uneven heat load, evaluate a control scheme that can write per-unit temperature and fan settings instead of running all cooling units at one fixed setpoint.

Who should read it

BMS/DCIM integrators, electrical and mechanical designers writing monitoring and metering specifications, and operators building energy management systems.

Document contents

  1. Scope
  2. Definitions
  3. Abbreviations and acronyms
  4. Architecture of data centre energy management
  5. Managed entities
  6. General requirements for data centre energy management (communication interfaces, measuring data)
  7. Minimum data set for energy management (static and dynamic data)
  8. Data definition and requirements (ICT and facility equipment)
  9. Appendix I: Optional data set for a cloud data centre
  10. Appendix II: Use cases for a minimum data set
  11. Appendix III: Suggested accuracy of measurement data
  12. Appendix IV: Related standardization activities

Related standards

  • ITU-T L.1300
  • ITU-T L.1305

Publication details

Authors
ITU-T Study Group 5
Publisher
International Telecommunication Union (ITU-T)
Year
2015
Document number
ITU-T L.1301 (05/2015)
Document language
English
Source type
Expert / community
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

ITU Recommendation, (c) ITU, all rights reserved; English PDF downloadable free of charge.

Citation

ITU-T Study Group 5 (2015). Recommendation ITU-T L.1301 (05/2015): Minimum data set and communication interface requirements for data centre energy management. International Telecommunication Union (ITU-T). ITU-T L.1301 (05/2015). https://www.itu.int/rec/T-REC-L.1301

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.