Data Centers for Utilities (ENERGY STAR)
U.S. Environmental Protection Agency (ENERGY STAR) · U.S. Environmental Protection Agency
An ENERGY STAR page for utility programme managers explaining why data centres are attractive efficiency-programme targets and the barriers programmes must address.
On this page
Overview
This page was prepared by the US Environmental Protection Agency's ENERGY STAR programme for utility efficiency-programme managers. It explains why data centres are attractive targets for efficiency programmes and which barriers programmes must address. The page also links the ENERGY STAR 5 and 16 ways resources and the LBNL Data Center Metering guide. The page aims to offer a general frame for designing programmes and points to two resources for that purpose.
The rationale rests on intense electricity use: per square foot, data centres can use up to 50 times the electricity of standard office space, based on Portfolio Manager data. A cited 2019 report states that an efficient data centre can use up to 80% less power than an inefficient one. Together these two figures form the core rationale for why efficiency programmes target data centres.
Among the barriers is risk aversion: a cited 2016 study put data centre downtime cost at $9,000 per minute, which drives risk-averse over-redundancy. The second is split incentives between IT decision-makers and energy-bill owners, which the page names as a key programme barrier. The page is a freely accessible ENERGY STAR resource, and only the record's summary and key facts were used here. Some of its figures rest on external reports it cites and are set in a US context.
Key points
- Per square foot, data centres can use up to 50 times the electricity of standard office space (Portfolio Manager data).
- A cited 2019 report states an efficient data centre can use up to 80% less power than an inefficient one.
- A cited 2016 study put downtime cost at $9,000 per minute, driving risk-averse over-redundancy.
- Split incentives between IT decision-makers and energy-bill owners are a key programme barrier.
- The page links to the ENERGY STAR ways resources and the LBNL Data Center Metering guide.
Using it in design
- In the cost model, attach utility incentive data (rebates) to measures such as efficient UPS, containment and economizers.
- Use the 50x office intensity figure as context in early-stage load estimates.
- In redundancy decisions, note as a risk remark how downtime cost can encourage over-redundancy.
Who should read it
Utility programme managers and designers assessing data centre energy cost and incentive opportunities.
Related standards
- LBNL Data Center Metering and Resource Guide
Publication details
- Authors
- U.S. Environmental Protection Agency
- Publisher
- U.S. Environmental Protection Agency (ENERGY STAR)
- Year
- 2026
- Document language
- English
- Source type
- Government / public
- Access
- Free to read
- Licence
- U.S. public domain: U.S. Government work; free to reuse
- Licence evidence
- www.copyright.gov
Original licence note
Published by a U.S. federal agency; works of the U.S. Government are not protected by copyright (17 U.S.C. 105).
Citation
U.S. Environmental Protection Agency (2026). Data Centers for Utilities (ENERGY STAR). U.S. Environmental Protection Agency (ENERGY STAR). https://www.energystar.gov/products/data_center_equipment/utilities
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.