Technical Guidelines on Code of Practice for Building Energy Audit (TG-EAC 2024, Addendum No. 1/2026)
Original title Technical Guidelines on Code of Practice for Building Energy Audit: incorporated with Addendum No.1/2026
Electrical and Mechanical Services Department, Hong Kong
Hong Kong EMSD guideline of about 75 pages: scope of the energy audit, central services boundary for data-centre portions of industrial buildings, a 5-year audit interval and EAC 2024 requirements applying from 20 September 2026.
On this page
Overview
The guideline from Hong Kong's Electrical and Mechanical Services Department (EMSD) explains the technical requirements of the Buildings Energy Efficiency Ordinance (Cap 610) and the Code of Practice for Building Energy Audit (EAC 2024). EAC 2024 was gazetted on 22 November 2024, and Rev. 1, incorporating legislative amendments, was issued on 19 December 2025. This guideline supports EAC 2024 (Rev. 1) and does not replace guidelines for earlier editions. EAC 2024 requirements apply to energy audits commenced on or after 20 September 2026.
The scope section lists building types requiring an energy audit under Schedule 4 of the Ordinance, including buildings occupied principally as a data centre and the data-centre portion of an industrial building. The definition of central building services installation (CBSI) depends on building type: in a data-centre portion of an industrial building, CBSI means installations solely serving that portion, and installations owned by someone other than the portion's owner (for example tenant-installed systems) are not CBSI. The start-of-operation date for a data centre is when permanent CBSI serving the portion first consumes electricity.
The audit is carried out by a Registered Energy Assessor (REA) and rests on at least 12 consecutive months of energy bills and consumption data, a breakdown of annual consumption and the energy utilisation index (EUI, kWh/m²/year). An audit is normally completed within 6 months of commencement and is repeated at least once every 5 years. An Energy Audit Form (showing the EUI) and a Data Disclosure Form are submitted with the report; technical information in the Data Disclosure Form is published on a public website. Implementing the energy management opportunities (EMO) is not mandatory.
The rest of the document covers building complexes and blocks as separate entities, energy import and export, audit templates and measurement practice, including a recommendation to collect at least 1 week of raw data at 15-minute intervals covering normal operating hours.
Key points
- EAC 2024 was gazetted on 22 November 2024; Rev. 1 issued 19 December 2025; requirements apply to audits commenced on or after 20 September 2026.
- Building types requiring an audit include buildings occupied principally as a data centre and the data-centre portion of an industrial building (Schedule 4, types 10 and 11).
- In a data-centre portion of an industrial building, CBSI means installations solely serving the portion; installations owned by someone other than the portion's owner (such as a tenant) are excluded.
- The start-of-operation date for the portion is when permanent CBSI first consumes electricity (including during construction, fitting-out, testing or commissioning).
- The audit needs at least 12 consecutive months of energy bills and consumption data; results are reported as EUI in kWh/m²/year.
- An audit is normally completed within about 6 months of commencement and repeated at least every 5 years.
- Energy management opportunities fall into three categories: housekeeping (no cost), operational changes (low cost) and higher capital investment; implementation is not mandatory.
- Technical information in the Data Disclosure Form is published by EMSD on a public website.
- Measurement recommendation: at least 1 week of raw data at 15-minute intervals covering normal operating hours.
Using it in design
- When designing a data-centre portion in a Hong Kong industrial building, separate installations serving the portion from tenant-owned systems at design stage to fix the audit boundary.
- Plan the sub-metering scheme to support a 12-month breakdown analysis (cooling, lighting, electrical distribution, IT).
- Track the start-of-operation date as the first electricity consumption of the permanent installation; it drives the audit calendar.
- Prepare EUI and the publicly disclosed Data Disclosure Form information for the operator's corporate reporting.
- Configure the BMS and metering to log data at 15-minute intervals.
- Tie the EMO list from the audit to the 5-year maintenance and investment plan.
Who should read it
Teams designing and operating data centres in Hong Kong, Registered Energy Assessors and building energy compliance advisers.
Document contents
- 1. Introduction
- 2. Interpretations and abbreviations
- 3. Application (scope, CBSI definitions, limit of scope)
- 4. Technical compliance with the Ordinance (control regime, demonstration of compliance, building complex, energy import and export, forms)
- 5. Objectives of energy audit
- 6. Overview of energy audit
- 7. Energy audit requirements and measurement practice
Publication details
- Authors
- Electrical and Mechanical Services Department, Hong Kong
- Publisher
- Electrical and Mechanical Services Department, Hong Kong
- Year
- 2026
- Document number
- TG-EAC 2024 / Addendum No.1/2026
- Document language
- English
- Source type
- Government / public
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official publisher document inspected. No document-specific commercial redistribution permission established; retain metadata and original short summaries only.
Citation
Electrical and Mechanical Services Department, Hong Kong (2026). Technical Guidelines on Code of Practice for Building Energy Audit: incorporated with Addendum No.1/2026. Electrical and Mechanical Services Department, Hong Kong. TG-EAC 2024 / Addendum No.1/2026. https://www.emsd.gov.hk/beeo/en/pee/TG-EAC_2024_Add2026.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.